1、<p><b> 附 錄</b></p><p><b> 英文論文</b></p><p> The characteristics of earth-rock DAMS and technical control</p><p> 1. selection of embankment type &l
2、t;/p><p> In general, there are two types of embankment dams: earth (earth fill dam) and rock fill(rock fill dam). The selection is dependent upon the usable materials from the required excavation and availabl
3、e borrow. It should be noted that rock fills can shade into soil fills depending upon the physical character of the rock and that no hard and fast system of classification can be made. Rocks which are soft and will easil
4、y break down under the action of excavation and placement can be classified with </p><p> The selection and the design of an earth embankment are based upon the judge ment and experience of the designer and
5、 is to a large extent of an empirical nature. The various methods of stability and seepage analysis are used mainly to confirm the engineer’s judge ment</p><p> 2. freeboard </p><p> All eart
6、h dams must have sufficient extra height known as freeboard to prevent overtopping by the pool. The freeboard must be of such height that wave action, wind setup, and earthquake effects will not result in overtopping of
7、the dam. In addition to freeboard, an allowance must be made for settlement of the embankment and the foundation which will occur upon completion of the embankment.</p><p> 3. top width </p><p>
8、; The width of the earth dam top is generally controlled by the required width of fill for ease of construction using conventional equipment. In general, the top width should not be less than 30 ft. if a danger exists o
9、f an overtopping wave caused either by massive landslides in the pool or by seismic block tipping, then extra top width of erosion resistive fill will be required.</p><p> 4.alignment </p><p>
10、 The alignment of an earth fill dam should be such as to minimize construction costs but such alignment should not be such as to encourage sliding or cracking of the embankment. Normally the shortest straight line across
11、 the valley will be satisfactory, but local topographic and foundation conditions may dictate otherwise. Dams located in narrow valleys often are given an alignment which is arched upstream so that deflections of the emb
12、ankment under pool load will put the embankment in compressio</p><p> 5. Abutments</p><p> Three problems are generally associated with the abutments of earth dams: ① seepage, ②instability, an
13、d ③transverse cracking of the embankment. If the abutment consists of deposits of pervious soils it may be necessary to construct an upstream impervious blanket and downstream drainage measures to minimize and control ab
14、utment seepage. </p><p> Where steep abutments exist, especially with sudden changes of slopes or with steep bluff, there exists a danger of transverse cracking of the embankment fills. This can be treated
15、by excavation of the abutment to reduce the slope, especially in the impervious and transition zones. The transition zones, especially the upstream, should be constructed of fills which have little or no cohesion and a w
16、ell-distributed gradation of soils which will promote self-healing should transverse cracking occur</p><p> 6. stage construction </p><p> It is often possible, and in some cases necessary, to
17、 construct the dam embankment in stages. Factors dictating such a procedure are: ①a wide valley permitting the construction of the diversion or outlet works and part of the embankment at the same time; ②a weak foundation
18、 requiring that the embankment not be built too rapidly to prevent overstressing the foundation soils ; ③a wet borrow area which requires a slow construction to permit an increase in shear strength through consolidation
19、of the </p><p> 7. Embankment soils</p><p> Most soils are suitable for use for embankment construction, however, there are physical and chemical limitations, soils which contain excessive sal
20、ts or other soluble materials should not be used. Substantial organic content should not exist in the soils. Lignite sufficiently scattered through the fill to prevent the danger of spontaneous combustion, is not objecti
21、onable. Fat clays with high liquid limits may prove difficult to work and should be avoided.</p><p> 8. Compaction requirements</p><p> The strength of the impervious and semi-impervious soils
22、 depends upon the compacted densities. These depend in turn upon the water content and weight of the compacting equipment. The design of the embankment is thus influenced by the water content of the borrow soils and by t
23、he practicable alternations to the water content either prior to placement of the fill or after placement but prior to rolling. If the natural water content is too high, then it may be reduced in borrow area by drainage,
24、 or </p><p> If necessary, test fills should be constructed with variations in placement water content, lift thickness, number of roller passes and type of rollers. For cases of steep abutment, the fill mus
25、t be placed in thin lifts and compacted by mechanical hand tampers. All overhangs should either be removed or filled with lean concrete prior to fill placement.</p><p> 9. types of instruments</p>&l
26、t;p> The type of instrumentation depends upon the size and complexity of the project. The devices in common use are: ①piezometers ; ②surface movement monuments ; ③settlement gadges ; ④inclinometers ; ⑤internal moveme
27、nt and strain indicators ; ⑥pressure cells ; ⑦seismic acceleration meter ;⑧movement indicators at conduit joints and other concrete structures</p><p><b> 中文譯文</b></p><p> 土石壩的特征及筑壩
28、技術(shù)控制</p><p> 1、土石壩壩型的選擇</p><p> 一般來說,土石壩有兩種類型:土壩和堆石壩。壩型的選擇取決于能從需要開挖的地點和可用的料場處取得合用材料的情況。應(yīng)當(dāng)指出的是,根據(jù)巖石的物理特性,堆石可以逐漸變化為填土,因而不能對土石料作出嚴(yán)格而固定的分類。那些軟弱的和在開挖填筑時容易破碎的巖石可被歸入填土類。而堅硬和不會大量破碎的的巖石,則列為堆石類。</p&g
29、t;<p> 一座土壩的選定和設(shè)計都有賴于設(shè)計人員的判斷和經(jīng)驗,而且在很大程度上是屬于經(jīng)驗性的。各種穩(wěn)定和滲透分析方法,主要是作為證實工程師的判斷而使用的。</p><p><b> 2、超高</b></p><p> 所有的土壩都必須有一個足夠的額外高度,稱為超高,以防止水庫漫頂。超高的高度必須足以在波浪作用、風(fēng)浪壅高和地震影響下,不會導(dǎo)致壩的漫
30、頂。除了超高外,對于壩建成時發(fā)生的壩體和地基沉陷,還必須在高度上留有余地。</p><p><b> 壩頂寬度</b></p><p> 土壩的壩頂寬度一般用常規(guī)設(shè)備便于施工的填筑寬度來控制。通常,壩頂寬度應(yīng)不小于30英尺。如果存在著大規(guī)模塌方進(jìn)入水庫,或者有因地震使巖塊倒落而引起波浪漫頂?shù)奈kU,則需要采用抗沖刷的材料填筑更寬的壩頂高度。</p>&
31、lt;p><b> 定線</b></p><p> 土壩的壩軸線選定應(yīng)盡量使建設(shè)費用降到最少,但是也不能因此引起壩體發(fā)生滑動或開裂。一般來說,一條橫跨河谷的最短的直線,可能滿足要求。但是,當(dāng)?shù)氐牡匦魏偷鼗鶙l件可能要求采用另外的方案。對于峽谷的壩,常采用向上游拱出的壩軸線,以便在壩體受庫水壓力作用而發(fā)生變形時,能使壩體壓緊,從而盡量減少其橫向開裂。</p><p&
32、gt;<b> 5、兩岸壩座</b></p><p> 一般有三個問題與土壩壩座有關(guān):①滲透;②不穩(wěn)定;③壩體的橫向開裂。如果壩座是由透水的沉積土構(gòu)成,就可能需要建造一道上游不透水的鋪蓋和下游排水設(shè)施,可盡量減少和控制壩座內(nèi)的滲透。</p><p> 在壩座岸坡很陡的地方,特別在邊坡突變或有陡壁處,那里的壩體填土?xí)a(chǎn)生橫向裂縫的危險。這個問題可以用開挖壩座放緩邊
33、坡來處理,這樣的處理在不透水區(qū)和過渡區(qū)特別需要。過渡區(qū),尤其是在上游側(cè)的過渡區(qū),必須用粘著力很小或無粘著力且顆粒級配良好的土料來填筑,這種土料如發(fā)生橫向裂縫時能自行愈合。</p><p><b> 6、分期施工</b></p><p> 土壩的分期施工往往是可能的,而且在一些情況下是必須的。要求這樣施工程序的因素是:①河谷寬闊,可以允許導(dǎo)流或泄水工程與一部分壩體同
34、時施工;②地基軟弱,要求壩體不要過快填筑,以防止地基中產(chǎn)生過大的應(yīng)力;③料場潮濕,要求放慢施工,以使土料能通過固結(jié)作用來增加抗剪強(qiáng)度。在某些情況下,可以需要增設(shè)基礎(chǔ)排水設(shè)施或填筑排水沙井,或采用水平透水的排水鋪蓋。</p><p><b> 7、 壩體的土料</b></p><p> 大多數(shù)土料適合于壩體填筑,然而,在物理和化學(xué)性質(zhì)上也有一定的局限,含有過多鹽和可
35、溶性物質(zhì)的土料,不可以使用。在土壤里不應(yīng)存在大量的有機(jī)質(zhì)成分。褐煤若能通過填筑而充分分散,無自然之虞,就不妨礙使用。而具有高度流限的肥粘土,多半難以施工,必須避免使用。</p><p><b> 8、壓實的要求</b></p><p> 不透水和半透水的土料的強(qiáng)度取決于壓實的密度。壓實密度又取決于土料的含水量和壓實設(shè)備的重量。因此,料場土料的含水量和在填筑前或堆筑
36、后而未碾壓前的填土實際含水量的變化,都會影響壩體的填筑。如果天然含水量太高,可以在料場用排水或?qū)⑼亮习宜傻霓k法來減低。如果土料太干燥,則需在料場用灑水和泡水的辦法把土料潤濕,然后再讓土料在使用以前保持穩(wěn)定的含水量。填筑時的含水量范圍一般介于比標(biāo)準(zhǔn)普氏最優(yōu)含水量低2%到高2%~3%之間。透水性土料至少壓實到相對密度的80%。</p><p> 如果需要,應(yīng)該變換填筑層的含水量、鋪層厚度、碾壓遍數(shù)和碾壓機(jī)的型式等,
37、進(jìn)行填筑試驗。對于坡度很陡的壩座部位,必須用薄層填筑,并用手扶打夯機(jī)夯實。所有外懸突出部位,均應(yīng)在填土堆筑以前挖除或用貧混凝土填平。</p><p><b> 9、觀測儀器的類型</b></p><p> 觀測儀器的類型取決于工程的規(guī)模和復(fù)雜性。通用的裝置是:①測壓計; ②表面位移標(biāo)志;③沉陷量測儀(計);④測斜儀;⑤內(nèi)部位移和應(yīng)變指示儀;⑥壓力盒(壓力傳感器或壓
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 土石壩外文翻譯---土石壩及溢洪道設(shè)計
- 外文翻譯--- 土石壩的施工
- 土石壩的施工畢業(yè)論文外文翻譯
- 土石壩的評估和修復(fù)畢業(yè)設(shè)計外文翻譯
- 試論土石壩施工技術(shù)
- 筑壩土石料動力特性研究.pdf
- 四川省水利工程土石壩建設(shè)與筑壩材料研究簡述
- 探索土石壩設(shè)計的關(guān)鍵技術(shù)
- 土石壩心墻結(jié)構(gòu)對土石壩抗震的影響.pdf
- 土石壩潰壩風(fēng)險評估關(guān)鍵技術(shù)研究及應(yīng)用.pdf
- 土石壩壩體施工與質(zhì)量控制
- 淺談土石壩的施工
- 大壩設(shè)計外文翻譯---從非飽和土力學(xué)的角度,土石壩材料的特性
- 中線法尾礦壩筑壩工藝及滲流、穩(wěn)定分析.pdf
- 淺析水庫土石壩除險加固技術(shù)的應(yīng)用
- 淺談小型水庫土石壩的除險加固技術(shù)
- 土石壩安全測控理論與技術(shù)的研究及應(yīng)用.pdf
- 土石壩防滲除險加固技術(shù)應(yīng)用探析
- 土石方填筑壩體施工方案
- 有關(guān)土石壩施工工藝控制的要點的探析
評論
0/150
提交評論