1、<p>  IQC     Incoming Quality Control          進(jìn)料檢驗(yàn)</p><p>  MQC    Material Quality Control          

2、 原材質(zhì)量控制</p><p>  PMC    Plane Material Control                生產(chǎn)排程控制-產(chǎn)銷</p><p>  PQE    Production Quality Engineering

3、   產(chǎn)品質(zhì)量工程</p><p>  FAT    Final Assembly Test                  最終組裝測(cè)試</p><p>  FRI     Fin

4、al Run-in Test                      最終運(yùn)行測(cè)試</p><p>  FFT    Final Function Test         

5、          最終功能測(cè)試</p><p>  QMS   Quality Management System      質(zhì)量管理系統(tǒng)</p><p>  MIS    Management Information System 信息管理系統(tǒng)

6、</p><p>  SQE   Supplier Quality Engineering         供應(yīng)商質(zhì)量工程</p><p>  CSP    Continue sampling plan         

7、0;     連續(xù)抽樣檢驗(yàn)方法</p><p>  FQA    Final Quality Assurance              最終品質(zhì)保證</p><p>  OBE    Out of Box

8、Experience              開(kāi)箱檢驗(yàn)(實(shí)驗(yàn))</p><p>  SDA    System Design Assurance          系統(tǒng)設(shè)計(jì)保證</p><p>  

9、ORT    On-going Reliability Test             可靠度實(shí)驗(yàn)</p><p>  OBA    Out of Box Audit              

10、0;       開(kāi)箱檢驗(yàn)</p><p>  F/A      Failure analysis                         不良分析

11、</p><p>  CA       Corrective Action                     改善措施(行動(dòng))</p><p>  CLCA   Closed

12、 loop corrective action      閉環(huán)改善</p><p>  ECN     Engineer Change Notice            工程變更事項(xiàng)</p><p>  ECR  

13、60;  Engineer Change Request          工程變更需求</p><p>  EIA     Engineer Issue Action               

14、; 工程問(wèn)題對(duì)策</p><p>  FIFO    First Input First Output              先進(jìn)先出</p><p>  DOA    Dead On Arrived     

15、0;                 到達(dá)死亡</p><p>  RMA    Return Material Authorization      退回認(rèn)可</p><p>  IPQC  

16、0;     in process quality control</p><p>  FQC        final quality control</p><p>  OQC        outgoing quality control</p><p>  B

17、OM        bill of material</p><p>  QE        quality engineering </p><p>  DCC        document center control</p><p>  M

18、RB        material review bom</p><p>  CAR        corrective action request</p><p>  FPC        flexible printed circuit board</p&g

19、t;<p>  NCR         non conforming report</p><p>  OBE         out of box evaluation</p><p>  IQA        internal quality audit

20、</p><p>  PCR        process change request</p><p>  IPO        internal purchase office</p><p>  IE        industrial en

21、gineering</p><p>  QPA        quality process audit</p><p>  QSA        quality system audit</p><p>  ATE        automati

22、c test equipment</p><p>  AOI        automatic optical inspection</p><p>  PCBA        print circuit board assembly</p><p>  TTL    

23、;     technology transfer list</p><p>  SQA        supplier quality assurance</p><p>  ORT        ongoing reliability testing</p><p&g

24、t;  QM        quality manual</p><p>  SW        software</p><p>  SOW        standard of work</p><p>  SCSI   

25、    small computer system interface</p><p>  SA        software  application</p><p>  SO        sales order</p><p>  MRP&

26、#160;       material requirement planning</p><p>  AVL        approved vendor list</p><p>  RD        research development center</p>

27、<p>  RD HQ        research development center head quarter</p><p>  QA         quality assurance</p><p>  PVT         product

28、verification test</p><p>  PRP        phase review process</p><p>  PM         project management</p><p>  PJE        pro

29、ject engineer</p><p>  PE        product engineer</p><p>  NPI        new product introduction</p><p>  MP        mass pr

30、oduction</p><p>  MFG        manufacturing</p><p>  ME        mechanical engineer</p><p>  KBD        keyboard</p>

31、<p>  IFR        instant failure rate</p><p>  IFIR         instant failure incident rate</p><p>  HW        hardware</p>

32、<p>  GI        great island </p><p>  ESD        electrostatic discharge</p><p>  EOL        end of life</p><p>  

33、EN        engineering notice</p><p>  EMI        electromagnetic interference</p><p>  EMC         electromagnetic compatibility</p

34、><p>  EE        electronic engineer(ing)</p><p>  EDC        electronic data center</p><p>  ECO        engineering change

35、order</p><p>  DVT         design  verification test</p><p>  DOA        dead on arrival</p><p>  CAD/ID       

36、 computer aided design /industrial design</p><p>  BIOS        basic input /output system</p><p>  AP        application program</p><p>  AFR

37、        annual failure rate</p><p>  NTF         no trouble found</p><p>  CND        can not duplicate</p><p>  DPPM

38、0;       defect parts per million</p><p>  FAI        first article inspection</p><p>  CLCA        closed loop corrective action</p>

39、<p>  MQR        monthly quality review</p><p>  RCA        root cause analysis</p><p>  TNB        terminal notebook business&

40、lt;/p><p>  FMEA        failure mode effect analysis</p><p>  LRR        line reject rate measured by DPPM</p><p>  MTQ      

41、0; manufacturing ,test and quality</p><p>  PFMEA        process failure mode effect analysis</p><p>  AVL        Approved Vendor List</p><p>

42、;  BOM        Bill of Material</p><p>  C.O.        Change Order</p><p>  CAP        Customer Audit Program</p><p>  DOA&

43、#160;       Dead on arrival</p><p>  DPPM        Defect parts per million</p><p>  ECO        Engineering change order</p><p>

44、  ECR        Engineering Change Release</p><p>  EFT        Enhanced Function Test</p><p>  FAI        First Article inspection</p&

45、gt;<p>  FMEA        Failure Mode Effect Analysis</p><p>  LRR        Line reject rate measured by DPPM </p><p>  MP        Mas

46、s Production</p><p>  MQR        Monthly Quality Review</p><p>  MQT        Manufacturing, Quality and Test</p><p>  ORT     

47、  Ongoing reliability testing</p><p>  PFMEA        Process Failure Mode Effect Analysis</p><p>  PT        Product test</p><p>  PVT

48、60;       Process validation test</p><p>  QES        Quality Engineering Testing</p><p>  QAD        Quality Assurance Department</p>

49、;<p>  QT        Quality test</p><p>  RTS        Ready To Ship</p><p>  RCA        Root Cause Analysis</p><p>  R

50、CD        Recovery CD disc</p><p>  SFIS        Shop Flow Information System</p><p>  SQRC        Supplier Quality Report Card</p&g

51、t;<p>  ST        System test</p><p>  SVC Tag        Dell service Tag.</p><p>  SWDL        Software Download</p><p

52、>  W/O        Work Order</p><p>  公司常用英語(yǔ)縮寫(xiě) 整理一下CORPORATE COMMON ABBREVIATION常用語(yǔ)縮寫(xiě)1 Organization組織                           1-1 HQ HeadQuarter 總

53、公司                 1-2Chairmen主席                       1-3Lite-On   Group光寶集團(tuán)            

54、;     1-4 President 總裁                                 1-5Executive Vice President 常務(wù)副總裁           

55、0;   1-6Vice President副總裁                           1-7HR   Human Resource人力資源部             1-8FIN   Financ

56、e 財(cái)務(wù)                   1-9Sales 銷售                                 1-10R&D   Resear&

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫(kù)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論