文檔簡介
1、目錄第一章編制依據(jù).................................................................................................................3第二章工程概況..........................................................................................
2、.......................4第三章施工部署.................................................................................................................51.項(xiàng)目組織機(jī)構(gòu)...................................................................
3、......................................62.各部門職責(zé)及任務(wù)劃分.........................................................................................63.資源配置.........................................................................
4、........................................9第四章工程施工方案.......................................................................................................131.一般地段施工方案.......................................................
5、........................................132.沙漠地區(qū)施工措施...............................................................................................313.施工便道、堆管場(chǎng)修建施工措施.......................................................
6、................344.開挖穿越公路施工方案.......................................................................................355.頂管穿越公路施工方案.......................................................................................37
7、6.現(xiàn)場(chǎng)冷彎管加工技術(shù)措施...................................................................................467.管道補(bǔ)口、防腐層保護(hù)施工措施.......................................................................488.閥室施工方案.........................
8、..............................................................................509.地貌恢復(fù)和護(hù)坡護(hù)岸施工措施...........................................................................5610.清管、試壓、掃描措施...................................
9、..................................................5911.三樁埋設(shè)施工措施.............................................................................................6812.與地下管道、光(電)纜并行及交叉的協(xié)調(diào)配合措施與施工方案......................68第五章施工準(zhǔn)備
10、工作........................................................................................................701.技術(shù)準(zhǔn)備..........................................................................................................
11、.....702.物資準(zhǔn)備...............................................................................................................713.施工人員及設(shè)備準(zhǔn)備...................................................................................
12、........714.現(xiàn)場(chǎng)準(zhǔn)備...............................................................................................................725.管理文件及資料..................................................................................
13、.................72第六章施工進(jìn)度計(jì)劃.......................................................................................................72第七章質(zhì)量保證措施及HSE管理措施......................................................................
14、...721.質(zhì)量保證措施.....................................................................................................742.HSE管理措施...............................................................................................
15、......94第八章工期保證措施.....................................................................................................1141.進(jìn)度控制.............................................................................................
16、....................................1142.合同控制............................................................................................................115第一章第一章編制依據(jù)編制依據(jù)(一)、適用范圍本施工組織設(shè)計(jì)僅適用于長慶氣田烏海臨河天然氣輸氣管道工程第一標(biāo)段。(二)、編制依據(jù)1
17、、招標(biāo)所配發(fā)的施工圖及相關(guān)文件;2、GB502512003《輸氣管道工程設(shè)計(jì)規(guī)范》;3、《原油和天然氣輸送管道穿跨越工程設(shè)計(jì)規(guī)范穿越工程》4、GBT9711.21999《石油天然氣工業(yè)輸送鋼管交貨技術(shù)條件第2部分:B級(jí)鋼管》;《關(guān)于處理石油管道和天然氣管道與公路相互關(guān)系的若干規(guī)定》((試行)(78)公交路字698號(hào),(78)油化管道字452號(hào))5、SYT409795《石油天然氣管道穿越工程施工及驗(yàn)收規(guī)范》;6、SY04702000《石油
18、天然氣管道跨越工程施工及驗(yàn)收規(guī)范》;7、SY040198《輸油輸氣管道線路工程施工及驗(yàn)收規(guī)范》;8、SYT03252001《鋼質(zhì)管道穿越鐵路和公路推薦做法》;9、SYT606494《管道干線標(biāo)記設(shè)置技術(shù)規(guī)定》;10、SY405693《石油天然氣鋼制管道對(duì)接焊縫射線照相及質(zhì)量分級(jí)》;11、SY406593《石油天然氣鋼制管道對(duì)接焊縫超聲波探傷及質(zhì)量分級(jí)》;12、SYT41031995《鋼制管道焊接及驗(yàn)收規(guī)范》;13、SYT407193《管
19、道下向焊工藝規(guī)程》;14、SY405292《油氣管道焊接工藝評(píng)定方法》;15、SYT52572004《油氣輸送用鋼制彎管》;16、《油氣田地面建設(shè)工程竣工驗(yàn)收手冊(cè)》(上、下冊(cè))有關(guān)規(guī)定及國家和行業(yè)現(xiàn)行質(zhì)量驗(yàn)收標(biāo)準(zhǔn);17、《中華人民共和國環(huán)境保護(hù)法》;18、《中華人民共和國安全生產(chǎn)法》;19、GBT19002ISO9000《質(zhì)量體系、生產(chǎn)、安裝和服務(wù)的質(zhì)量保證模式》和我公司質(zhì)量體系程序文件和相關(guān)標(biāo)準(zhǔn);20、有關(guān)國家、行業(yè)及地方頒發(fā)的現(xiàn)行的
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 長輸管線施工組織設(shè)計(jì)
- 天然氣長輸管線系統(tǒng)
- 石油天然氣長輸管線施工方案
- 天然氣長輸管線施工技術(shù)分析
- 石油天然氣長輸管線施工方案
- 天然氣施工組織設(shè)計(jì)
- 長輸天然氣管道施工組織設(shè)計(jì)(技術(shù)標(biāo))
- 天然氣施工組織設(shè)計(jì)
- 長輸天然氣管道施工組織設(shè)計(jì)(技術(shù)標(biāo))
- 天然氣場(chǎng)站施工組織設(shè)計(jì)
- 天然氣場(chǎng)站施工組織設(shè)計(jì)
- 天然氣調(diào)壓站施工組織設(shè)計(jì)
- 天然氣場(chǎng)站工程工藝施工組織設(shè)計(jì)
- 天然氣安裝施工組織設(shè)計(jì)方案
- 廣西液化天然氣項(xiàng)目施工組織設(shè)計(jì)
- 長輸管道施工組織設(shè)計(jì)
- 天然氣長輸管道安全施工探析
- 天然氣長輸管線的隱患問題及對(duì)策研究
- 天然氣燃?xì)夤艿朗┕そM織設(shè)計(jì)
- 天然氣長輸管線全系統(tǒng)的模擬研究.pdf
評(píng)論
0/150
提交評(píng)論