1、<p><b> 附 錄A</b></p><p> The Design of Pull Arm Garbage Truck</p><p> 1The introduction of Pull Arm Garbage Truck</p><p> Pull arm garbage truck is equipped
2、with two types of chassis that has a trunk load and unloading functions to pull arm device-specific vehicles. It can be achieved with car trunk the combination and separation, while the bulk of the trunk to achieve self-
3、unloading cargo operations. The model has been widely used in foreign countries, often in the domestic industry as a sanitation refuse collection vehicles. 5 t pull arm garbage truck is one of the commonly used models, c
4、ompared to 8 t Arm pull o</p><p> 2 Pull the boom structure and principle of the device</p><p> 2.1 The structural characteristics of pull-arm device</p><p> 5 t pull arm garbage
5、 truck pulling device consists of pulling the boom arm and pull arm cylinder, the United Moving frame, trunk insurance hook and cylinder, and the frame. La Boom device structural arrangement shown in figure 2, pull teles
6、copic arm is not used right-angle bend structure. the end of the cylinder and pull the piston rod side arm hinged on the hinge pivot B; Another linkage frame front end and hinged at the hinge pivot C, the formation of a
7、rotary arm pull heart. Cylinder head cyl</p><p> 2.2 The working principle of the device arm pull</p><p> Pulling garbage truck arm by pulling the device to complete the function of two differ
8、ent dynamic, for boxes and dumping. When the pull device for boom box action, the first cylinder insurance hook action open the trunk insurance hook, trunk lift insurance. Pull lift arm cylinder piston rod elongation fro
9、m the pull arm, pull arm to pivot around the hinge C clockwise rotation, the hook arm to pull back move. If the frame is equipped with a trunk, the trunk was pushed home ground. When put on the </p><p> Whe
10、n the pull-arm device dumping action, and action for different box, trunk insurance hook dump in the whole process to ensure that tension in the arm and trunk are not isolated, that is pull arm、the linkage through the tr
11、unk rack and trunk link between the insurance as one of the hook, by the deputy rear frame hinge pivot clockwise rotation axis D, lifting carriages lifted until the refuse rubbish. Trunk reset, as long as the retraction
12、of cylinder piston rod pull arm, the pulling arm body sti</p><p> 3 La Boom Selection and design of device structure parameters </p><p> 3.1 Device to pull the boom pivot hinge arrangement and
13、 geometry of the main structure </p><p> Determined by the following three areas:</p><p> a. Arm by pulling a dump truck performance, it is 5 t pull the best selection of cars from the arm unl
14、oading chassis, the chassis can be selected according to the length of pull arm device to determine frame the total length. To ensure the car to pull arm for changing trunk and dumping action by the force of the chassis
15、reasonable and complete the dumping arm pull action pivot hinge rotation axis D of the location should be arranged in behind the rear spring plate from the chassis rear bearing a</p><p> b. According to the
16、 first hinge pivot D arm pull for me the beginning of the selected pivot hinge rotation axis C. In the design and production of the actual process of pulling the car arm in arm had appeared during the pull action althoug
17、h the initial state, pull arm lift carriages, failed to pull arm pivot around the hinge C rotation, but with the linkage frame with the rotation around the hinge pivot point D, which can not get trunk open the beginning
18、of fall; when lifting a certain height, t</p><p> c. Important geometrical parameters arm pull a pull arm foot radius of gyration for pull the oil boom turning radius of the cylinder piston rod end of radiu
19、s of gyration of the angle between the two radius. From the above points analysis we know that, The smaller of radius. The greater the force needed to pull the smaller cylinder arm. Meet the requirements under the premis
20、e of arms-for-me pull-foot turning radius, the smaller the better, La boom cylinder rod side radius of gyration R. The bigge</p><p> 3.2 The selection of pull arm cylinder and cylinder installation angle y.
21、 The range of </p><p> Determined by the following two aspects: </p><p> a. By mapping method or analytical method to determine the location of the above the hinge pivot and Pull arm geometry
22、and other components, may initially determine the pull-stroke arm cylinder and installation distance. </p><p> b. Pull arm cylinder mounting angle of La Boom is the important structural parameters of device
23、s. By the former knowledge, pull the boom box or device for carrying out the process of dumping action, pull the oil boom cylinders have to be overcome trunk (full load) resistance torque generated by gravity, and the li
24、fting crane action start unloading boxes when the moment of resistance is the greatest moment of resistance to overcome, and in Boom began pulling action of the hinge pivot device stati</p><p> By pulling i
25、n the boom cylinder is installed between the frame and trunk floor, oil cylinder installation layout space is limited, so the pull arm cylinder mounting angle range is also very limited. Design principles to children as
26、much as possible to install a large angle, choose the right drawing arm oil pulling arm cylinder bore to meet performance requirements for the use of vehicles, without increasing the cost and fuel tank weight, and easy l
27、ayout. Analysis and comparison of some domestic </p><p><b> 附 錄B</b></p><p><b> 拉臂式垃圾車設(shè)計</b></p><p><b> 1拉臂車概述</b></p><p> 拉臂
28、式垃圾車是在二類汽車底盤上裝有使車箱具有裝載和卸載功能的拉臂架裝置的專用汽車。它可實現(xiàn)車箱與汽車的結(jié)合和分離,同時對車箱的散裝貨物實現(xiàn)自卸作業(yè)。目前該車型已在國外得到廣泛使用,在國內(nèi)也常作為環(huán)衛(wèi)行業(yè)的垃圾收集運輸車。5 t拉臂式垃圾車是常用車型之一,相比8 t以上的大噸位拉臂車,其拉臂架裝置結(jié)構(gòu)較簡單,便于國內(nèi)廠家生產(chǎn);而大噸位拉臂車常采用進口拉臂架裝置。國內(nèi)各生產(chǎn)廠家生產(chǎn)的5 t拉臂車的拉臂架裝置的結(jié)構(gòu)雖大致相同,但重要的結(jié)構(gòu)參數(shù)的選
29、用和結(jié)構(gòu)布置設(shè)計的不同,會直接影響拉臂車的工作性能。</p><p> 2拉臂裝置的結(jié)構(gòu)和工作原理</p><p> 2.1拉臂架裝置的結(jié)構(gòu)特點</p><p> 5 t拉臂式垃圾車拉臂架裝置主要由拉臂和拉臂油缸、聯(lián)動架、車箱保險鉤和保險鉤油缸、以及副車架組成。拉臂采用的是不可伸縮的直角折彎式結(jié)構(gòu),其一端與拉臂油缸的活塞桿端鉸接于鉸支點B,另一端與聯(lián)動架前端軸
30、心鉸接于鉸支點C,形成了拉臂的回轉(zhuǎn)軸心。拉臂油缸的缸頭端鉸接在副車架前端鉸支點A上;聯(lián)動架后端軸心鉸接在副車架后部的鉸支點D,形成聯(lián)動架的回轉(zhuǎn)軸心。聯(lián)動架上設(shè)置了車箱保險鉤和保險鉤油缸。</p><p> 2.2拉臂架裝置的工作原理</p><p> 拉臂式垃圾車通過拉臂架裝置完成兩種不同的功能動作:換箱和傾卸。當(dāng)拉臂架裝置進行換箱動作時,首先保險鉤油缸動作,開啟車箱保險鉤,車箱解除了
31、保險。拉臂油缸活塞桿伸長舉起拉臂,使拉臂繞鉸支點c順時針回轉(zhuǎn),拉臂鉤就往后移動。如果副車架上裝有車箱,則車箱被推置地上。當(dāng)?shù)厣宪囅湟嵘宪嚰軙r,使拉鉤先鉤住車箱吊環(huán),然后收縮活塞桿,使拉臂以鉸支點c為軸心逆時針回轉(zhuǎn),將車箱提上放平后,保險鉤油缸動作,拉起車箱保險鉤,使車箱固定在副車架上。當(dāng)拉臂架裝置進行傾卸動作時,與換箱動作不同,車箱保險鉤在整個傾卸過程中要處在保證拉臂與車箱不分離,即拉臂、聯(lián)動架及車箱通過車箱保險鉤相互聯(lián)結(jié)為一體,以副
32、車架后部鉸支點D為軸心順時針回轉(zhuǎn),舉升車箱直到卸去垃圾。車箱復(fù)位時,只要拉臂油缸活塞桿回縮,整個拉臂機構(gòu)仍以鉸支點D為轉(zhuǎn)軸點逆時針回轉(zhuǎn),直至車箱復(fù)位。</p><p> 3拉臂架裝置結(jié)構(gòu)參數(shù)選用與設(shè)計</p><p> 3.1拉臂架裝置各鉸支點的布置及主要結(jié)構(gòu)幾何尺寸</p><p><b> 按以下三方面確定:</b></p>
33、;<p> a.因拉臂車具有傾卸工作性能,故5 t拉臂車最好選用自卸底盤,可根據(jù)所選定的底盤長度,確定拉臂架裝置副車架的總長度。為了保證拉臂車進行換箱和傾卸動作時底盤受力合理,拉臂完成傾卸動作的回轉(zhuǎn)鉸支點D的軸線位置應(yīng)布置在距底盤后輪彈簧鋼板后支座軸線的后部,間距約為0~100mm。.</p><p> b.根據(jù)鉸支點D先初選定拉臂換箱回轉(zhuǎn)鉸支點c的軸線位置。在設(shè)計生產(chǎn)5 t拉臂車的實際過程中,
34、曾出現(xiàn)拉臂在進行換箱動作初始狀態(tài)時拉臂雖舉升車箱,但拉臂未能繞鉸支點C轉(zhuǎn)動,卻隨聯(lián)動架一起繞鉸支點D轉(zhuǎn)動,從而無法讓車箱開始下滑;當(dāng)舉升一定高度后,在車箱重力作用下,鉸支點C會突然落下,使拉臂、聯(lián)動架及車箱突然下落,產(chǎn)生較大;中擊,造成換箱動作極不安全平穩(wěn)。要解決此問題,確定鉸支點C的軸線位置尤其重要。首先一方面鉸支點C水平軸線不能高于鉸支點D水平軸線布置。另外,由鉸支點C受力分析可知,鉸支點C的水平軸線必須低于拉臂油缸缸頭鉸支點A的水
35、平軸線,同時起始動作時拉臂鉤垂直軸線必須布置在鉸支點C和鉸支點A之間。</p><p> c.拉臂重要結(jié)構(gòu)幾何參數(shù)有拉臂換箱回轉(zhuǎn)半徑、拉臂油缸活塞桿端回轉(zhuǎn)半徑、兩回轉(zhuǎn)半徑之間的夾角。由前述分析可知,越小,越大,則拉臂油缸所需的作用力越小。故在滿足使用要求的前提下,拉臂換箱回轉(zhuǎn)半徑越小越好,拉臂油缸活塞桿回轉(zhuǎn)半徑盡可能越大越好,這樣可使拉臂結(jié)構(gòu)緊湊,作業(yè)空間小。</p><p> 3.2
36、拉臂油缸的選用和油缸安裝角的取值范圍</p><p><b> 按以下二方面確定:</b></p><p> a.通過作圖法或解析法計算確定以上各鉸支點的位置和拉臂等構(gòu)件的幾何尺寸后,可初步確定拉臂油缸的最大行程和安裝距。計算出油缸作用力和的值,作為油缸的負載依據(jù)來確定油缸缸徑。</p><p> b.拉臂油缸安裝角是拉臂架裝置重要的結(jié)構(gòu)
37、參數(shù)。由前述知,拉臂架裝置在進行換箱或傾卸動作的過程中,拉臂油缸均要克服車箱(滿載)的重力產(chǎn)生的阻力矩,而且吊裝吊卸車箱起始動作時的阻力矩是要克服的最大阻力矩,而且在開始動作時拉臂架裝置的各鉸支點的靜摩擦阻力矩和慣性阻力矩最大。故拉臂油缸安裝角需滿足。由前分析所知,當(dāng)越大時,拉臂油缸所需的最大推力就越小,選擇的拉臂油缸缸徑就可越小。</p><p> 因拉臂油缸的安裝位置位于副車架和車箱底板之間,油缸安裝布置空
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 垃圾車拉臂式垃圾車的改裝設(shè)計
- 英文翻譯外文文獻翻譯219拉臂式垃圾車設(shè)計
- 英文翻譯外文文獻翻譯219拉臂式垃圾車設(shè)計
- 畢業(yè)設(shè)計_垃圾車拉臂式垃圾車的改裝設(shè)計
- 英文翻譯外文文獻翻譯219拉臂式垃圾車設(shè)計.docx
- 英文翻譯外文文獻翻譯219拉臂式垃圾車設(shè)計.docx
- 垃圾車拉臂式垃圾車的改裝設(shè)計開題報告.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計開題報告.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計開題報告.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計開題報告.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計開題報告.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計開題報告.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計開題報告.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計說明書.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計說明書.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計說明書.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計說明書.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計說明書.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計說明書.doc
- 垃圾車拉臂式垃圾車的改裝設(shè)計說明書.doc
評論
0/150
提交評論