2023年全國碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩9頁未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、<p><b>  MEDU</b></p><p>  First, optimize the design of the impact of construction investment…………………3</p><p>  Second, optimizing the design of the operation of the causes of d

2、ifficult ……………5</p><p>  Three, do a good job of optimizing the design Suggestions……………………………7</p><p><b>  目錄</b></p><p>  一、優(yōu)化設(shè)計(jì)對建設(shè)投資的影響……………………………………………………3</p>

3、<p>  二、優(yōu)化設(shè)計(jì)運(yùn)作困難的成因………………………………………………………5</p><p>  三、搞好優(yōu)化設(shè)計(jì)的幾點(diǎn)建議………………………………………………………7</p><p>  On the optimization of design and engineering </p><p>  construction inve

4、stment control </p><p>  論優(yōu)化設(shè)計(jì)與工程建設(shè)投資控制</p><p>  Investment control of construction projects are of concern to investors in each one of the important contents.On construction projects, the inves

5、tment in control throughout the entire process of project construction. Investment from the current control point of view, through the project proposal and feasibility study stage to estimate the investment and project a

6、pproval of the implementation of corporate accountability, investment scale has been effectively controlled, the kind of investment, as</p><p>  建設(shè)項(xiàng)目投資控制是每個投資者所關(guān)心的重要內(nèi)容之一。就工程項(xiàng)目建設(shè)而言,投資控制貫穿于項(xiàng)目建設(shè)的全過程。從目前的投資控制來看,

7、通過對項(xiàng)目建議書和可行性研究階段投資估算的審批和項(xiàng)目法人負(fù)責(zé)制的實(shí)行,投資規(guī)模得到了有效控制,象以前那種投資無底洞,工期馬拉松的現(xiàn)象已基本杜絕。設(shè)計(jì)階段通過限額設(shè)計(jì),使設(shè)計(jì)概算超投資估算的現(xiàn)象得到了基本控制。施工階段通過招標(biāo)投標(biāo)和施工監(jiān)理的全面推行,使工程預(yù)算投資得到了合理的確定和有效控制,通過造價(jià)咨詢服務(wù)部門和審計(jì)部門對工程結(jié)算和決算的審核,剔除了其中的不合理部分,使該階段的投資也得到了應(yīng)有的控制。但如何通過優(yōu)化設(shè)計(jì)來有效控制投資 ,

8、尚未得到廣泛重視。</p><p>  First, optimize the design of the impact of construction investment</p><p>  一、優(yōu)化設(shè)計(jì)對建設(shè)投資的影響</p><p>  Design a direct impact on investment</p><p>  1.

9、設(shè)計(jì)方案直接影響投資</p><p>  Construction process including project decision-making, project design and implementation of the project three major stages. Investment in control of the key decision-making and the desig

10、n stage, and make investment decisions in the project, its key is the design. According to the research analysis, design fee, generally speaking, only the equivalent of construction project life-cycle cost of 1% or less,

11、 but it is this less than 1% of the cost of investment is as high as 75% more than single pro</p><p>  2. Designed indirectly affect the quality of investment </p><p>  2.設(shè)計(jì)質(zhì)量間接影響投資</p>&

12、lt;p>  According to statistics, the quality of the project at the many reasons for the accident, the design of the majority accounted for 40.1% duty, ranking first.Many building products because of the lack of optimum

13、 design, and feature set appears unreasonable, the impact of normal use; some design drawings of poor quality, professional design contradictions between, resulting in rework construction, lay-off phenomenon, and some ca

14、used by quality defects and security hidden dangers to the country and</p><p>  據(jù)統(tǒng)計(jì),在工程質(zhì)量事故的眾多原因中,設(shè)計(jì)責(zé)任多數(shù)占40.1%,居第一位。不少建筑產(chǎn)品由于缺乏優(yōu)化設(shè)計(jì),而出現(xiàn)功能設(shè)置不合理,影響正常使用;有的設(shè)計(jì)圖紙質(zhì)量差,專業(yè)設(shè)計(jì)之間相互 矛盾,造成施工返工、停工的現(xiàn)象,有的造成質(zhì)量缺陷和安全隱患,給國家和人民帶來巨

15、大損失,造成投資的極大消費(fèi)。震驚全國的寧波大橋事故就是這方面的典型例證。</p><p>  The design of program impact recurrent costs</p><p>  3.設(shè)計(jì)方案影響經(jīng)常性費(fèi)用</p><p>  Designed to optimize the impact of project construction is

16、 not only a one-time investment, but also the impact of the use phase of the recurrent costs, such as HVAC, lighting energy consumption, cleaning, maintenance, repair fees, one-time investment and recurrent costs must ha

17、ve the inverse relationship, but by optimizing the design of efforts to seek the best combination of both to enable the projects to the construction of the lowest life-cycle costs.</p><p>  優(yōu)化設(shè)計(jì)不僅影響項(xiàng)目建設(shè)的一次性投

18、資,而且還影響使用階段的經(jīng)常性費(fèi)用,如暖通、照明的能源消耗、清潔、保養(yǎng)、維修費(fèi)等,一次性投資與經(jīng)常性費(fèi)用有一定的反比關(guān)系,但通過優(yōu)化設(shè)計(jì)可努力尋求這兩者的最佳結(jié)合,使項(xiàng)目建設(shè)的全壽命費(fèi)用最低。</p><p>  Second, optimizing the design of the operation of the causes of difficult </p><p>  優(yōu)化設(shè)計(jì)

19、運(yùn)作困難的成因</p><p>  1.Government department director of the Optimal Design of monitoring ineffective</p><p>  政府主管部門對優(yōu)化設(shè)計(jì)監(jiān)控不力</p><p>  A long time, developed a design of owner responsi

20、bility, design quality and design units to guard the pass from the concept of the design department director the results of a lack of the necessary assessment and evaluation, and some drawings joint hearing alone to find

21、 some simple questions that only such a major technical issues to come to be held accountable, while the program is the economic question, and even less. In addition, the design of market management is not enough leapfro

22、g, undocume</p><p>  長期以來,形成了一種設(shè)計(jì)對業(yè)主負(fù)責(zé),設(shè)計(jì)質(zhì)量由設(shè)計(jì)單位自行把關(guān)的觀念,主管部門對 設(shè)計(jì)成果缺乏必要的考核與評價(jià),有的僅靠圖紙會審來發(fā)現(xiàn)一些簡單問題,只有等出現(xiàn)了大 的技術(shù)問題才來追究責(zé)任,而方案的經(jīng)濟(jì)性則問及更少。另外,對設(shè)計(jì)市場管理不夠,越級、無證、掛靠設(shè)計(jì)時有發(fā)生,從而導(dǎo)致設(shè)計(jì)質(zhì)量下降,加之由于設(shè)計(jì)工作的特殊性,不同的項(xiàng)目有各自的特點(diǎn),所以針對不同項(xiàng)目優(yōu)化設(shè)計(jì)的成果

23、缺乏明確的定性考核指標(biāo)。</p><p>  2. Optimize the owners do not have a strong sense of design</p><p>  業(yè)主要求優(yōu)化設(shè)計(jì)的意識不強(qiáng)</p><p>  At present, the owners tend to focus on control of investment on th

24、e construction aspect, but has not placed enough emphasis on the design aspect.he reasons: First, the design of the impact of recognition of the importance of investment is not enough to engage only see the construction

25、tender, the tender price must be less than the bid price, the construction units to let, etc., not knowing the optimal design will bring about greater savings; The second is not a good selection and design units, </p&

26、gt;<p>  目前,業(yè)主往往把投資的控制重心放在施工環(huán)節(jié)上,而對設(shè)計(jì)環(huán)節(jié)重視不夠。其原因:一是對設(shè)計(jì)對投資影響的重要性認(rèn)識不夠,只看到搞施工招標(biāo),投標(biāo)價(jià)要低于標(biāo)底價(jià)、施工單位 要讓利等,殊不知設(shè)計(jì)方案的優(yōu)化會帶來更大的節(jié)約;二是無法很好地選擇設(shè)計(jì)單位,因?yàn)樵谠O(shè)計(jì)前業(yè)主不知道誰能優(yōu)化到什么程度。有些項(xiàng)目設(shè)計(jì)雖通過招投標(biāo),但此時方案不細(xì), 概算粗略,很難來綜合評定;三是業(yè)主由于專業(yè)知識上的限制,對設(shè)計(jì)方案難以從優(yōu)化擾的角度

27、提出要求或疑義;四是有些業(yè)主經(jīng)濟(jì)實(shí)力雄厚擾,項(xiàng)目建設(shè)趕時髦,求新穎,根本不提優(yōu)化要求;五是有些業(yè)主自身對工程應(yīng)具備的功能要求及應(yīng)達(dá)到的目標(biāo)不明確,隨意性 大,要求出圖時間緊,又壓低設(shè)計(jì)收費(fèi),從而也影響了優(yōu)化設(shè)計(jì)的開展。3.Optimize the design to carry out the lack of the necessary pressure and power </p><p>  3.優(yōu)化設(shè)計(jì)的

28、開展缺乏必要的壓力和動力</p><p>  Designed because of the current operators are often based on the relationship between the lack of fair competition, so the design of the unit level the focus is not technology improve o

29、n the design as long as the guarantee that no major quality problems, the program is good or bad, high and low cost, has little to do, Optimize the design so that the loss of pressure. Now because of the design fee was b

30、ased on the area or by the terms of the proportion of the cost of admission, almost conservatio</p><p>  由于目前的設(shè)計(jì)經(jīng)營往往憑的是關(guān)系,缺乏公平競爭,所以設(shè)計(jì)單位的重心不在技術(shù)水平的提高上,設(shè)計(jì)只要保證不出大的質(zhì)量問題,方案的好壞、造價(jià)的高低,關(guān)系不大,使優(yōu)化設(shè)計(jì) 失去壓力。由于現(xiàn)在的設(shè)計(jì)收費(fèi)是按面積或按

31、造價(jià)的比例計(jì)取,幾乎跟投資的節(jié)約和設(shè)計(jì)質(zhì) 量的優(yōu)劣無關(guān),導(dǎo)致對設(shè)計(jì)方案不認(rèn)真進(jìn)行經(jīng)濟(jì)分析,而是追求高標(biāo)準(zhǔn),或?yàn)楸kU(xiǎn)起見,隨意加大安全系數(shù),造成投資浪費(fèi)。相反,設(shè)計(jì)單位即使花費(fèi)了較多的人力、物力,優(yōu)化了設(shè)計(jì)方案,給業(yè)主節(jié)約了投資,但也不能得到應(yīng)有的報(bào)酬,有時設(shè)計(jì)費(fèi)反而變少了,從而挫傷了優(yōu)化設(shè)計(jì)的積極性。4.優(yōu)化設(shè)計(jì)運(yùn)行的機(jī)制不夠完善.</p><p>  Designed to optimize the opera

32、tion need to have a good mechanism as a guarantee.And the current situation, there was a lack of fair market competition mechanism design, the design of the tender can not be extended and deepened, places, industry, depa

33、rtment protection seriously; Second, twist the pricing mechanism, optimize the prices should not; three mechanisms are weak laws and regulations.</p><p>  優(yōu)化設(shè)計(jì)的運(yùn)行需有良好的機(jī)制作為保證。而目前的狀況,一是缺乏公平的設(shè)計(jì)市場競爭機(jī) 制,設(shè)計(jì)招標(biāo)未能得到推

34、廣和深化,地方、行業(yè)、部門保護(hù)嚴(yán)重;二是價(jià)格機(jī)制扭曲,優(yōu)化 不能優(yōu)價(jià);三是法律法規(guī)機(jī)制薄弱。</p><p>  Three, do a good job of optimizing the design Suggestions</p><p>  三、搞好優(yōu)化設(shè)計(jì)的幾點(diǎn)建議</p><p>  The competent authorities should be

35、 strengthened to optimize the design of monitoring </p><p>  1.主管部門應(yīng)加強(qiáng)對優(yōu)化設(shè)計(jì)工作的監(jiān)控</p><p>  In order to ensure optimization of the design work carried out by government departments began to enforc

36、e, through the design of the outcome of conducting a comprehensive review before implementation. As the "Construction Quality Management Ordinance", one of the supporting document "Construction Design Inte

37、rim Measures for document review," the Ministry of Construction has been building [2000] No. 41, promulgated text, it will control the implementation of Designed to provide an important guara</p><p>  為

38、保證優(yōu)化設(shè)計(jì)工作的進(jìn)行,開始可由政府主管部門來強(qiáng)制執(zhí)行,通過對設(shè)計(jì)成果進(jìn)行全面審查后方可實(shí)施。作為《建設(shè)工程質(zhì)量管理?xiàng)l例》的配套文件之一的《建筑工程施工圖設(shè)計(jì) 文件審查暫行辦法》已由建設(shè)部建設(shè)[2000]41號文頒布施行,它的實(shí)施將對控制設(shè)計(jì)質(zhì)量提供重要保證。但《辦法》規(guī)定的審查主要是針對設(shè)計(jì)單位的資質(zhì)、設(shè)計(jì)收費(fèi)、建設(shè)手續(xù)、 規(guī)范的執(zhí)行情況、新材料新工藝的推廣應(yīng)用等方面的內(nèi)容,缺乏對方案的經(jīng)濟(jì)性及功能的合 理性方面的審查要求,所以建設(shè)主

39、管部門在執(zhí)行《辦法》的同時,應(yīng)增加人員配備和審查力度,對設(shè)計(jì)成果進(jìn)行全面審查。第二,應(yīng)加強(qiáng)對設(shè)計(jì)市場的管理力度,嚴(yán)格通過資質(zhì)管理、人員注冊、設(shè)計(jì)招標(biāo)、圖紙審查等環(huán)節(jié)來規(guī)范設(shè)計(jì)市場,減少黑市設(shè)計(jì)。第三,利用主管部門的職能,總結(jié)推廣標(biāo)準(zhǔn)規(guī)范、標(biāo)準(zhǔn)設(shè)計(jì)、公布合理的技術(shù)經(jīng)濟(jì)指標(biāo)及考核指標(biāo),為優(yōu)化設(shè)計(jì)的進(jìn)行提供良好服務(wù)。</p><p>  2.To speed up the design and supervision

40、work in the promotion of</p><p>  2.加快設(shè)計(jì)監(jiān)理工作的推廣</p><p>  Optimize the design of the implementation of surveillance by the Government alone can not meet the requirements of social development, de

41、sign and supervision has become owner. Through the design and supervision units can be designed to break their control over their own single situation. Therefore, the department director should do a good job of the Gover

42、nment Commissioner at the same time, on the one hand, design and supervision should be set up as soon as possible qualification unit approval c</p><p>  優(yōu)化設(shè)計(jì)工作的推行,僅靠政府監(jiān)控還不能滿足社會發(fā)展的要求,設(shè)計(jì)監(jiān)理已成為形勢所迫 ,業(yè)主所需。通過設(shè)計(jì)監(jiān)理可

43、打破設(shè)計(jì)單位自己控制自己的單一局面。因此,主管部門應(yīng)在 搞好政府監(jiān)理的同時,一方面應(yīng)盡快建立設(shè)計(jì)監(jiān)理單位資質(zhì)的審批條件,加強(qiáng)設(shè)計(jì)監(jiān)理人才 的培訓(xùn)考核和注冊,制定設(shè)計(jì)監(jiān)理工作的責(zé)職、收費(fèi)標(biāo)準(zhǔn)等;另一方面通過行政手段來保證 設(shè)計(jì)監(jiān)理的廣度,為設(shè)計(jì)監(jiān)理的社會化的提供條件。</p><p>  Designed to establish the necessary mechanism of competition &l

44、t;/p><p>  3.建立必要的設(shè)計(jì)競爭機(jī)制</p><p>  Designed in order to ensure fair competition in the market, design the operation of the bidding process should be used, although in early 1984, the then State Deve

45、lopment Planning Commission and the Environmental Protection Department of urban and rural construction will be issued "Interim Measures for the bidding process engineering design", in 1995 the Ministry of Cons

46、truction No. 230 text published "Urban Architecture Design campaign management approach", the new award's "Tendering" is also p</p><p>  為保證設(shè)計(jì)市場的公平競爭,設(shè)計(jì)經(jīng)營也應(yīng)采用招標(biāo)投標(biāo),雖然早在1984年,當(dāng)時國家計(jì)委 和城鄉(xiāng)

47、建設(shè)環(huán)境保護(hù)部就印發(fā)《工程設(shè)計(jì)招標(biāo)投標(biāo)暫行辦法》,1995年建設(shè)部230號文印發(fā)了《城市建筑方案設(shè)計(jì)競選管理辦法》,新頒的《招標(biāo)投標(biāo)法》中也規(guī)定符合條件的項(xiàng)目的 勘察設(shè)計(jì)必須招標(biāo),但實(shí)際招標(biāo)項(xiàng)目的量一直很少,只占總項(xiàng)目的10%左右(不同的地區(qū)其 比例可能有所不同),即使采用招標(biāo)的項(xiàng)目,其招標(biāo)體系不完善評標(biāo)方法不健全,缺乏公平競爭性,因此應(yīng)完善設(shè)計(jì)招投標(biāo)的相關(guān)環(huán)節(jié)。首先,應(yīng)成立合法的設(shè)計(jì)招標(biāo)代理機(jī)構(gòu);其次,各地方主管部門應(yīng)建立相應(yīng)的規(guī)定,

48、符合條件的項(xiàng)目必須招標(biāo);第三,業(yè)主對擬建項(xiàng)目應(yīng)有明確的功能及投資要求,有編制完整的招標(biāo)文件;第四,招標(biāo)時應(yīng)對投標(biāo)單位的資質(zhì)信譽(yù)等方面進(jìn)行必要的資格審查;第五,應(yīng)設(shè)立健全的評標(biāo)機(jī)構(gòu)合理的建設(shè)評標(biāo)方法,以保證設(shè) 計(jì)單位公平競爭,并限制業(yè)主在項(xiàng)目上的隨意性?! ?lt;/p><p>  Designed to enhance the competitiveness of units, in the internal m

49、anagement should be put on design quality linked with the personal benefits to designers to strengthen economic concepts, the technical and economic unity, and change the previous design process does not settle the accou

50、nts, design the end of the phenomenon known estimates , draw a balance disturbance by the operator into a draw disturbance, and director, chief engineer with the Cost Engineercommon control design process. 設(shè)計(jì)單</p&

51、gt;<p>  Improve relevant laws and regulations</p><p>  4.完善相應(yīng)的法律法規(guī)</p><p>  Designed to optimize the promotion must also have laws and regulations as a guarantee, there are "Contrac

52、t Law", "Construction Law", "Construction Quality Management Ordinance" and other projects in the norms, but these are are from the overall project construction starting on the design specificati

53、on was not specific enough, so for better supervision and management of design work, but also to establish and improve relevant laws and regulations, such as design and supervision, design tendering, </p><p>

54、;  5. Designed to optimize the comprehensive job 5.注意優(yōu)化設(shè)計(jì)工作的綜合性 By optimizing the design to control the investment is a comprehensive problem, should not one-sided emphasis on investment in conservation, it is ne

55、cessary to correctly handle the technical and economic unity of opposites is the key to control the investment aspect. Designed not only to oppose the one-sided emphasis on savings, to ignore the reasonable demands of te

56、chnically, so that projects tend to fail to function, but also </p><p>  通過優(yōu)化設(shè)計(jì)來控制投資是一個綜合性問題,不能片面強(qiáng)調(diào)節(jié)約投資,要正確處理技術(shù)與經(jīng) 濟(jì)的對立統(tǒng)一是控制投資的關(guān)鍵環(huán)節(jié)。設(shè)計(jì)中既要反對片面強(qiáng)調(diào)節(jié)約,忽視技術(shù)上的合理要求,使項(xiàng)目達(dá)不到功能的傾向,又要反對重視技術(shù),輕經(jīng)濟(jì)、設(shè)計(jì)保守浪費(fèi)的現(xiàn)象。設(shè)計(jì)人員要用價(jià)值工程的原理來進(jìn)行

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論