2023年全國碩士研究生考試考研英語一試題真題(含答案詳解+作文范文)_第1頁
已閱讀1頁,還剩12頁未讀 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、<p><b>  翻 譯</b></p><p><b>  原文</b></p><p>  Motorized Pulleys Solve Harsh Environmental Problems</p><p>  at North American Ship Loading Terminals&l

2、t;/p><p>  Keywords: Motorized Pulleys, Ship Loaders, Bucket Wheel Stacker Reclaimers, Conveyor Belts</p><p>  1 Abstract</p><p>  This paper presents design and operational challenges

3、 faced by three different ship loading facility operators, one handling export coal on the Gulf of Alaska and two handling taconite iron ore pellets on the North American Great Lakes. Extreme temperatures and abrasive ma

4、terials, coupled with a need for compactness, made internally-powered and hermetically-sealed Motorized Pulleys the optimal design choice for driving ship loader and bucket wheel reclaimer conveyor belts.</p><

5、p>  Originally a European idea, the Motorized Pulley was slow in gaining acceptance in North America in the twentieth century.However, the internally-powered conveyor belt drive has recently become more popular,especi

6、ally where ambient conditions, material handled, or compact equipment design make exposed drives difficult to integrate and operate.</p><p>  2 Introduction</p><p>  What do Seward, Alaska; Supe

7、rior, Wisconsin; and Escanaba, Michigan have in common? Each is the location of a major rail-to-ship bulk storage and transfer facility, owned and operated by a railroad company. Each is located on water north of 45

8、6;N latitude, where winter temperatures can drop to –40º F (-40ºC) and humidity reach nearly 100%. And each handles abrasive and/or corrosive material. One other important feature is common to these facilities.

9、..the Rulmeca Motorized Pulley. Rulmeca’s inter</p><p>  This paper will review each facility’s layout, throughput, and particular challenges and it will explain why designers selected Motorized Pulley techn

10、ology. These successful applications will help explain the growth in acceptance of Motorized Pulley technology in North America, especially in harsh environments.</p><p>  3 Motorized Pulley Technology</p

11、><p>  The Motorized Pulley concept was developed in the 1950’s to provide a reliable means of driving belt conveyors. Equipment designers quickly discovered that enclosing the drive’s motor and gearbox within

12、a hermetically-sealed and oil-filled pulley shell not only made the drive compact, it also greatly improved the drive’s reliability and service life.</p><p>  Fig. 1: Rulmeca Motorized Pulley encloses motor

13、and gearbox within hermetically-sealed oil-filled shell to protect moving components from harsh environment while saving space.</p><p>  Compactness, reliability, long service life, and limited maintenan

14、ce requirements made the Motorized Pulley a popular conveyor drive for bulk handling equipment designers in Europe. Large machinery such as bucket wheel reclaimers, ship loaders, and tunnel boring equipment soon had Moto

15、rized Pulleys installed as original equipment. And plant operators began replacing worn exposed conveyor drives with Motorized Pulleys at facilities handling materials such as fertilizer, sand & gravel, steel, ore,&l

16、t;/p><p>  Each Motorized Pulley consists of an AC squirrel-cage induction motor, directly coupled to a helical/spur gearbox,mounted on a fixed(non-rotating) shaft, and hermeticallysealed within the cylindrical

17、 pulley shell.Today’s Motorized Pulley incorporates a wide array of powers and speeds as well as optional features ,such as built-in mechanical backstops, anti-condensation heaters, and electro-mechanical brakes.</p&g

18、t;<p>  4 Allouez Dock #5</p><p>  4.1 Synopsis of Upgrade</p><p>  Burlington Northern Santa Fe Railroad(BNSF) recently completed the overhaul of two of three 40 year old crawler-mounted

19、 bucket wheel reclaimers at the company’s rail-toship transfer terminal for taconite pellets located near Superior, Wisconsin.</p><p>  4.2 Objective of Upgrade</p><p>  The objective of the upg

20、rade was to reduce high maintenance expense while improving system reliability in the stockpile area. The upgrade included structural changes, replacement of on-board diesel engines, and the installation of Rulmeca</p

21、><p>  Motorized Pulleys. The challenge for BNSF operations was to keep the 40 year old machines working efficiently in spite of the fact that the machines’ manufacturer</p><p>  had gone out of bu

22、siness more than 20 years ago. The original conveyor drives were a unique combination of components including AC motors, planetary gearboxes and pulleys mounted between the carrying and return strands of belt. Since orig

23、inal equipment manufacturer’s parts were no longer available and since the conveyor drives were non-standard, BNSF was forced to custom-build parts, an expensive</p><p>  and time-consuming process. Engineer

24、ing Design Services recommended Rulmeca Motorized Pulleys because: (1) they are compact and would fit within the reclaimers’ structure, (2) Rulmeca Motorized Pulleys and replacement parts are readily available, and (3) R

25、ulmeca has a long successful track record of supplying conveyor drives for bucket wheel reclaimers.</p><p>  4.3 Operating Data</p><p>  As summarized in Table 2, Allouez Dock #5 consists of an

26、87 acre (0,3 km2) facility providing 5.5 million tons of storage capacity in a stockpile area 3.5 miles (5,6 km) from the dock and 72,000 tons of storage in the dock silos. A conveyor system, 5.7 miles (9,2 km) in length

27、, links the 2 rail car unloaders, the 3 stacker reclaimers, and the ship loader. Taconite pellets usually arrive in BNSF trains of 150 cars [each 35 feet (10,7 m) long “H-1” type at 1,800 ft3 (51) capacity] and are loade

28、d i</p><p>  4.4 Motorized Pulley Experience</p><p>  Engineering Design Services and Rulmeca engineers first presented the Motorized Pulley upgrade concept for the bucket wheel reclaimers to BN

29、SF personnel in 1995, suggesting a “Dual Drive” arrangement for the tail conveyor due to its requirement of 200 HP (150 kW). Allouez Dock had been maintaining the bucket wheel machines without the assistance of the origi

30、nal equipment manufacturer for more than 10 years in 1995. However, the dual drive concept was relatively new at that time and eight years w</p><p>  The successful upgrade of the first machine encouraged BN

31、SF to upgrade a second Bucket Wheel Reclaimer, completed in 2005, using three 100 HP (75kW) Rulmeca Motorized Pulleys. The third and final set of Motorized Pulleys was delivered July 2006. Engineering Design Services not

32、 only assisted BNSF personnel with initial design to insure a smooth retrofit, Roger Meittunen also traveled to the Rulmeca Motorized Pulley factory in Germany to observe final assembly of the first three Motorized Pulle

33、ys </p><p>  Fig. 2: 4,000 TPH Bucket Wheel Reclaimer in its second season after the 2004 Motorized Pulley upgrade. Note one Motorized Pulley beneath the boom conveyor and two under the tail conveyor.</p&

34、gt;<p>  5 Escanaba, Michigan</p><p>  5.1 Synopsis of Upgrade</p><p>  The Escanaba Ore Dock transfers 8 MTPY of taconite pellets from rail to lake vessels at the Lake Michigan terminal.

35、 The Chicago and Northwest Railroad replaced two worn-out Motorized Pulleys on the their bucket wheel reclaimer in 1985, after approximately 15 years of service, when the original Motorized pulley manufacturer went out o

36、f business. John Kirkegaard Maskinfabrik A/S supplied the replacement known as “JOKI Motorized Pulleys,” now called Rulmeca Motorized Pulleys. The two 40 inch (1 m) </p><p>  5.2 Objective of Upgrade</p&g

37、t;<p>  The objective of the upgrade was to secure reliable drives for the 4000 TPH reclaimer boom and tail conveyors from an established Motorized Pulley manufacturer with readily available replacement parts. JOK

38、I had been an established brand for 30 years at that time.</p><p>  Fig. 3: Traveling ship loader loads pellets into 64,000 DWT lake vessel at 4,000 TPH, filling it in</p><p>  just 16 hours.<

39、;/p><p>  Fig. 4: Bucket Wheel boom is hydraulically luffed and transfers 4,000 TPH of taconite pellets on a </p><p>  60 inch (1,5 m) wide belt at 715 FPM (3,6 m/s).</p><p>  5.3 Moto

40、rized Pulley Experience</p><p>  The Rulmeca Motorized Pulleys installed on the bucket wheel reclaimer in 1985 are still in service and have now outlasted the original 16 year old pulleys by five shipping se

41、asons. They have enabled the Escanaba Ore Dock to transload more than 150 million tons of taconite pellets during their service life.</p><p>  Fig. 5: Drawing shows unique double end housing arrangement on “

42、drive side” of 200 HP (150 KW) Motorized Pulley. Development of different designs and more powerful Motorized Pulleys is in </p><p>  progress at Rulmeca FAA GmbH</p><p>  6 Conclusion</p>

43、<p>  The long service lives promised by large Rulmeca Motorized Pulleys at three major transloading facilities with harsh operating conditions demonstrate the value of Motorized Pulley technology. There are now m

44、ore than 130,000 Motorized Pulleys, 1 HP (0,75 kW) and larger, in service in North America. Including fractional HP Motorized Pulleys, there are nearly 1 million units in service. A proven design, which hermetically seal

45、s its drive system within a compact and oil-filled pulley shell, and a re</p><p><b>  中文譯文</b></p><p>  電動滾筒克服北美船運裝載終端的惡劣環(huán)境問題</p><p>  關(guān)鍵字: 電動滾筒, 船運裝載機, 斗輪堆取料機, 傳送帶</

46、p><p><b>  1 概要</b></p><p>  這篇論文介紹了三個不同船運裝載操作工所面臨的設(shè)計和操作上的挑戰(zhàn),一個在阿拉斯加海灣裝載用于出口的煤,另兩個在北美五大湖裝載鐵礦石。極端的溫度、具有腐蝕性的原料, 再加上需要良好的密封性,這些都使得具有內(nèi)在動力而且密封性良好的電動滾筒成為驅(qū)動船運裝載機和斗輪堆取料機傳送帶的最佳選擇。</p><

47、;p>  最初,電動滾筒是一個歐洲人的想法,在二十世紀的北美已經(jīng)慢慢接受了它。然而,具有內(nèi)在動力的傳送帶驅(qū)動器近來變得很流行,特別是在那些因為外在環(huán)境、原料性質(zhì)或者設(shè)備需要緊湊的設(shè)計使得暴露在外面的驅(qū)動機無法融入設(shè)備而且會運轉(zhuǎn)困難的地方。</p><p><b>  2 緒論</b></p><p>  西華德、阿拉斯加州,瑟譜雷爾、威斯康星州,埃斯科拿巴、密歇

48、根州有什么共同點呢?每一個地方都是主要的鐵路-船運的中轉(zhuǎn)貯料場所,而且都有由鐵路公司擁有和操作的中轉(zhuǎn)設(shè)備;每一個地方都坐落在北緯45º的水平線上,那里冬天的溫度能降到零下40ºC而且濕度接近100%;每個地方都處理那些有腐蝕性的原料。另一個重要特征是它們都擁有陸美嘉電動滾筒,陸美嘉的電動滾筒因具有內(nèi)在動力而且密封性良好被選用來升級驅(qū)動貨運船與斗輪堆取料機傳送帶的驅(qū)動機。</p><p>  這

49、篇論文介紹每個設(shè)備的設(shè)計、生產(chǎn)量還有一些特殊的挑戰(zhàn),它將解釋為什么設(shè)計人員選擇電動滾筒技術(shù),這些成功的應(yīng)用將幫助我們解釋北美地區(qū)特別是有惡劣環(huán)境的地區(qū)為何越來越多的應(yīng)用電動滾筒技術(shù)。</p><p><b>  3 電動滾筒技術(shù)</b></p><p>  電動滾筒技術(shù)這一概念是在十九世紀五十年代為了給驅(qū)動帶式輸送機定義而發(fā)展起來的。裝置設(shè)計者很快發(fā)現(xiàn)將驅(qū)動器的馬達和

50、變速箱嵌入一個具有良好密封性并且充滿油的皮帶輪罩里不僅可以使驅(qū)動器緊湊,而且它能大幅提高驅(qū)動器的可靠性和工作壽命。</p><p>  圖1: 陸美嘉電動滾筒將馬達和變速箱嵌入嵌入一個具有良好密封性并且充滿油 皮帶輪罩里</p><p>  為了在惡劣環(huán)境中保護移動部件同時節(jié)省空間。</p><p>  緊湊、可靠、長時間服務(wù)壽命和有限的維護要求使電動滾筒成為歐洲散

51、裝運輸設(shè)備設(shè)計者喜歡的輸送機驅(qū)動器。大型機械設(shè)備像斗輪堆取料機、船用裝載機和隧道挖掘設(shè)備使電動滾筒能像原先設(shè)備一樣被安裝,而且設(shè)備操作者開始在運輸散料諸如化肥、沙石、鐵礦石和木材制品時用電動滾筒替換舊的且暴露在外的輸送機驅(qū)動器。</p><p>  每個電動滾筒把一個鼠籠式交流感應(yīng)電動機,直接連接在一個螺旋式齒輪變速箱,安裝在一根固定的軸上并將柱形皮帶輪罩密封好。現(xiàn)在的電動滾筒包括一組動力和速度設(shè)備還有其它附加設(shè)

52、備諸如機械支持物、加熱器、電動機械剎車等。</p><p>  4 Allouez 5號碼頭</p><p><b>  4.1 升級計劃</b></p><p>  圣達菲北部布林頓鐵路公司最近大修兩臺近40年歷史的斗輪堆取料機,它們放在離瑟譜雷爾、威斯康星州不遠的地方,平時用來將鐵路運輸?shù)蔫F礦石轉(zhuǎn)至船上。</p><p&

53、gt;<b>  4.2 升級目的</b></p><p>  這次升級目的是為了減少高額的維護費用同時提高在散料場地工作時的系統(tǒng)可靠性,這次升級包括對結(jié)構(gòu)的改進、船上柴油機的替換和陸美嘉電動滾筒的安裝。這次BNSF公司的改進計劃所面臨的問題是使這些有40年歷史的機器能有效的運轉(zhuǎn)起來,盡管這些機器的生產(chǎn)商在20多年前就已經(jīng)倒閉。原先的傳動機驅(qū)動器是一個由好幾個部件組成的獨特設(shè)備,它包括交流電

54、動機、變速箱和安裝在運輸與回程帶之間的滑輪。由于原先的設(shè)備制造廠商的一些部件不能用了,而且輸送機的驅(qū)動器不是標準的,BNSF公司不得不定制這些部件,這是個即費時又費錢的過程。工程設(shè)計維護公司建議使用陸美嘉電動滾筒有以下理由: </p><p> ?。?)它們簡潔緊湊適合于取料機的結(jié)構(gòu);</p><p>  (2)陸美嘉電動滾筒和取代部分很好用;</p><p>

55、;  (3)陸美嘉公司早已成功推出各種用于斗輪堆取料機的輸送機驅(qū)動器,技術(shù)較成熟。</p><p><b>  4.3 運行數(shù)據(jù)</b></p><p>  Allouez 5號碼頭包括87英畝擁有五百五十萬噸儲存能力的場地,它離碼頭大概3.5英里的路程,還有擁有七萬兩千噸儲存量的碼頭筒倉,輸送系統(tǒng)有5.7英里長,包括兩輛軌道卸載車,三臺堆取料機,還有貨船裝載設(shè)備。1

56、50輛車容量的鐵礦石通常先裝在BNSF公司火車里,然后再裝進貨船里,能達到185輛車容量的火車可以拖動兩萬噸的鐵礦石,在加上火車自身重量總重量可以達到兩萬七千頓。那里冬天的溫度能達到零下34度,雖然冰沒有覆蓋整個湖,但是有相當(dāng)一部分已覆蓋,厚度從幾英寸到幾英尺。最早從十一月中旬一直可以到五月初,湖上的冰使得船運無法進行,可能到了八九月份還能在堆料場里找到冰塊,BNSF公司的75個員工在2003年卸了537次火車和79201次汽車。<

57、;/p><p>  4.4 關(guān)于電動滾筒的經(jīng)驗</p><p>  1995年,工程設(shè)計維護公司和陸美嘉的工程師首次向BNSF公司提出電動滾筒升級概念,提出為了達到150KW的動力要求而且在尾部輸送機處采用雙電動機排列。Allouez 碼頭 在沒有原來設(shè)備制造廠商的幫助下自己維護斗輪堆取料機已經(jīng)有十年多的時間了,然而,在那時作為新的概念的雙電動機到2003年把第一臺斗輪堆取料機升級完已經(jīng)花了八

58、年的時間,原先的變速箱改造已經(jīng)變得很昂貴了,那時購買了三個直徑800㎜寬1400㎜的800H型電動滾筒,BNSF公司的實施人員在2004年才安裝上它們,每個電動滾筒提供90 kW的動力,此動力由安裝在船上的柴油機產(chǎn)生,可以使皮帶以4 m/s的速度運行。這緊湊的設(shè)計減小了結(jié)構(gòu)修改量,大大簡化了尾部輸送機底下雙電動機的結(jié)構(gòu)。</p><p>  第一臺機器的成功升級促使BNSF去升級第二臺斗輪堆取料機,第二臺也已經(jīng)在

59、2005年完成,用了三個75kW的陸美嘉電動滾筒,第三臺電動滾筒于2006年7月交貨。工程設(shè)計維護公司不僅幫助BNSF設(shè)計人員進行初始設(shè)計,而且Roger Meittunen親自拜訪了位于德國的陸美嘉電動滾筒工廠,觀察第一批三個電動滾筒的最后裝配,得到了800H型的售后服務(wù)訓(xùn)練,使得在Allouez 碼頭的電動滾筒能長期成功的工作。</p><p>  圖2: 在2004年電動滾筒的升級后,4000噸每小時的斗輪

60、取料機已工作兩個季度,注意輸送</p><p>  機下面的一個電動滾筒還有尾車輸送機下面的兩個電動滾筒。</p><p>  5 埃斯科拿巴, 密歇根</p><p><b>  5.1 升級計劃</b></p><p>  密歇根湖的埃斯科拿巴礦石碼頭每年將八百萬頓鐵礦石從鐵路轉(zhuǎn)運至湖運船,芝加哥和西北鐵路公司在19

61、85年替換了它們斗輪堆取料機上兩個過時的機械化輪,在15年的工作后,原先的制造廠商倒閉了,John Kirkegaard Maskinfabrik 將著名的“JOKI Motorized Pulleys”座位了替代品,也就是現(xiàn)在的陸美嘉電動滾筒,這兩個直徑1米功率150KW的電動滾筒已經(jīng)工作了近二十多年。 </p><p><b>  5.2 升級目的</b></p><

62、p>  升級的目的是為了給工作量4000頓每小時的取料機和尾部的輸送機提供穩(wěn)定的動力,而這替換部件得從一家有經(jīng)驗的廠商提供,JOKI 是一個有了近30年的老品牌了。</p><p>  圖3: 裝船設(shè)備以4000噸每小時的速度裝運礦石,可以在16小時內(nèi)裝滿</p><p>  圖4: 斗輪的發(fā)動機是個水壓轉(zhuǎn)舵,能以4000噸每小時的速度將鐵礦石轉(zhuǎn)移到1.5米寬的輸送</p>

63、;<p><b>  帶上。</b></p><p><b>  5.3 感受</b></p><p>  陸美嘉電動滾筒自從1985年安裝在斗輪取料機上起直到現(xiàn)在還在工作,已經(jīng)超過了原先的16年壽命預(yù)期,從而使得埃斯科拿巴礦石碼頭在它們的壽命內(nèi)多運輸了150多萬噸的鐵礦石。</p><p>  圖5: 圖中

64、所示為150 kW電動滾筒的驅(qū)動器兩邊兩個端蓋排列設(shè)計,馬力更為強大的電動滾</p><p><b>  筒正在研制。 </b></p><p><b>  6 結(jié)論</b></p><p>  在惡劣環(huán)境下三臺設(shè)備上所裝的陸美嘉電動滾筒做到了曾經(jīng)的承諾-長壽命,這也體現(xiàn)了電動滾筒的價值,現(xiàn)在有130,000多臺0,75

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論