1、<p>  Urban Underground Railroad arch tunnel Construction Technology Group</p><p>  Abstract Project in Guangzhou Metro Line, right-arch construction method of tunnels to explore. Subway Construction i

2、n Guangzhou for the first time put forward a double-arch tunnel to single-hole tunnel construction technology, and a single type of wall and split in the wall structure, comparison and selection of Technology solutions w

3、ere obtained to meet the structural safety, construction safety and Economic benefits of better Technology solutions for the future design and construction of sim</p><p>  Keywords: double-arch tunnel group;

4、 a single type of wall; construction Technology; split in the wall. </p><p>  As the circuit design requirements subway tunnel, the tunnel structure produces a variety of forms, ranging from cross-sec

5、tion from double-arch and the three-arch tunnel composed of double-arch tunnel section is commonly used in the connection lines and crossing lines. In this paper, engineering examples, according to tunnel in which geolog

6、ical conditions, duration requirements, raised through the comparison and selection can achieve rapid construction and the purpose of construction cost saving</p><p>  1 Project Overview</p><p>

7、  Guangzhou Metro Line Road station turn-back line of sports for sports Road station after the return line, structure complex, DK3 016.047 ~ 037.157 varying cross-section set the double-arch structure, three-arch structu

8、re of tunnels. Ranging from cross-arch tunnel excavation span 20.1m, excavation height of 10.076m, cross-vector ratio of 1:0.5, after lining a hole span 5.2m, large holes, after lining span 11.4m, the wall thickness of 1

9、.6 m. Three double-arch tunnel excavation span 19.9m, excavati</p><p>  Section 2 dual-arch construction scheme comparison</p><p>  As the double-arch tunnel segment structure more complex, the

10、tunnel cross-section changes in large, complicated construction process, construction was very difficult, the construction cycle is long, so I chose a good quality and efficient completion of the construction program seg

11、ment arch tunnel construction is particularly important. Selection of a construction program, the main consideration the following aspects: (1) construction safety and structural safety; (2) construction difficulties; &l

12、t;/p><p>  2.1 a single type of wall construction plan </p><p>  The program's main construction steps and measures are as follows: </p><p>  (1) The right line of double-a

13、rch tunnel hole within the return line side of temporary construction access, dual-arch and the three-arch in the wall construction, is completed in a timely support for the wall, the construction to prevent bias.

14、 </p><p>  (2) construction of the wall lining is completed, according to "first small then big, closed into a ring" principle, the right line with the step method of construction, with CRD enginee

15、ring method returned a four-lane span tunnel construction. </p><p>  (3) When the return line side of the construction to the three-arch tunnel in the wall, then in accordance with the right line of t

16、he wall construction method and the three-arch-arch in the wall construction, during which the right line to stop excavation until the completion of construction of the wall. </p><p>  (4) The return

17、line side of the wall construction is completed, the right line to continue to move forward the construction. </p><p>  The construction method for the domestic double-arch tunnel of conventional cons

18、truction method, Guangzhou Metro, Nanjing and Beijing Metro subway both applications, and can secure successful completion of the construction of tunnels. However, examples of past engineering and construction Technology

19、 research can be found, the program has weaknesses and shortcomings. </p><p>  (1) The program used in this project, in a short span of 21.11m of double-arch tunnel, the tunnel's opening between the

20、 supporting and secondary lining will be converted four times, the conversion too frequently. </p><p>  (2) wall and side holes covered by waterproof layer of tunnel lining construction, steel enginee

21、ring, formwork, concrete pouring required multiple conversions, the construction period up to 2 months. </p><p>  (3) The lining is completed, the wall of anti-bias materials, equipment, support and i

22、nput, resulting in higher construction costs, Economic efficiency will drop. </p><p>  2.2 The split in the wall construction plan </p><p>  The program's main construction steps and

23、measures are as follows: </p><p>  (1) ranging from cross-double-arch tunnel into two single-hole, change the formula for the separation wall, the first line of one-way right-forward construction of t

24、he tunnel. </p><p>  (2) three arch tunnel in the wall to make the first non-Shi lining, according to single-line working condition through. </p><p>  (3) the right line of large-s

25、ection double-arch tunnel wall construction method adopted in accordance with CRD. </p><p>  (4) The return line is in accordance with the right line of the opposite side of the construction sequence

26、of construction. </p><p>  Adoption of this program is in fact a one-way in accordance with the construction of two methods, compared with the previous one, after the program has the following advanta

27、ges:</p><p>  (1) reduction of the construction process to speed up the convergence process conversion. </p><p>  (2) reduce the construction difficulty, shortening the construction cycle

28、. </p><p>  (3) reduce the construction costs and improve Economic efficiency. </p><p>  (4) change a single type of wall to separate the wall, completely solved the structure of d

29、ouble-arch tunnel waterproofing defects. </p><p>  (5) The three-arch tunnel in the latter pArt of the construction hole, equivalent to large-span rock tunnels reserved for the core is conducive to bo

30、th sides of the double-arch tunnel construction safety (Table 1). </p><p>  Section 3 three-arch construction plan </p><p>  Right-line direct access to three double-arch tunnel, the Supp

31、ort parameters to the original designs for grating erection of the whole ring, according to design the whole ring of shotcrete, and enhance the bolt at the wall vault settings (return right side Tong Line Construction me

32、thod), wall construction in the tunnel when you need to get rid of Office, located at a vertical grill joints strengthened beam. </p><p>  Strict control of excavation footage of each cycle, grid spa

33、cing of 0.6m / Pin. Weak in the wall excavation using millisecond blasting program (conditional maximize the use of static blasting programs), minimize the wall rock and the lining of the tunnel has been disturbed, to en

34、sure construction safety. The completion of excavation in the wall immediately after the secondary lining. After the completion of construction of the wall in wall voids of the backfilling, plus jack supports. The side o

35、</p><p>  4 construction of the force structure of Behavior Analysis </p><p>  Across the range of the double-arched wall canceled, changed to separate the wall, in the domestic urban unde

36、rground railway engineering has not yet been a similar engineering design and construction experience, there is no such tunnel structure design, and therefore the structure is safe, as well as the course of construction

37、conversion process of construction is safe, the program will be the focus of the study. </p><p>  Application of ANSYS finite element software for common procedures ranging from cross-arch tunnel nume

38、rical simulation, using stratigraphic - structural model of the structure of the tunnel by the force and deformation analysis (Figure 1, Figure 2, Figure 3). The scope of the horizontal direction taken by force along the

39、 direction of the tunnel cross-section to cross-hole 3 times the limit, taking the top of the vertical direction to the surface, the bottom-hole span to 3 times the limit, unit m</p><p>  5 Construction of k

40、ey technologies and corresponding measures </p><p>  Arch tunnel construction segment is required on a strict construction organization and strong technical assurance measures carried out under the go

41、od job in organizing the construction of steps to prepare the construction of a variety of technical preventive measures are key to success.</p><p>  5.1 pairs of pull anchor and strengthen the bolt &

42、lt;/p><p>  Abolition of a single type of wall, the excavation is complete in the wall thickness of 0.8m, pull anchor and strengthen the right bolt set is very necessary. Φ22 steel bolt used on the pull bolt dr

43、ug volume, pitch, 0.6m × 0.5m, the length of the wall thickness according to the 0.8 ~ 2.0m. Strengthen the bolt in the wall located at the invert and side walls at both sides, using 3.0m of Φ25 hollow grouting anch

44、or, spacing 0.6m × 0.8m. </p><p>  5.2 in the body wall, grouting rock block folders </p><p>  In the wall of rock thinnest Department to 0.15m, after repeated blasting excavation pro

45、cess, the impact of the rock wall around the loose, their bearing capacity affected. Therefore, we must separate the wall in the vault, wall, invert Department for loose rock for grouting. Φ42 embedded steel, cement slur

46、ry to take - water glass pairs of liquid slurry, the parameter of 1:1 cement and 30 ~ 45Be sodium silicate solution, grouting pressure of 0.2 ~ 1.0MPa. In both excavation grouting in the wall </p><p>  5.3 m

47、illisecond blasting technology microseisms </p><p>  Tunnel excavation construction method used in all drilling and blasting. Because the lot is located in downtown Guangzhou, the ground-intensive bui

48、ldings, and the Tunnel "0" spacing excavation, blasting must be set aside in accordance with glossy layer of smooth microseismic millisecond blasting program construction blasting vibration control will be allo

49、wed within the . For the double-arch tunnel in which strata of Ⅲ, Ⅳ grade rock blasting to take measures as follows: </p><p>  (1) The blasting equipment, using low-speed emulsion explosive shock.

50、 </p><p>  (2) strict control of footage per cycle (0.6 ~ 0.8m), around the borehole spacing of 0.4m, reduce the loading dose to control the smooth blasting effect (Figure 4). </p><p> 

51、 (3) The use of multiple detonators per blast detonation, using non-electric millisecond detonator initiation network asymmetric micro-vibration technology. </p><p>  (4), excavation and construction

52、of the wall at the second to take first reserve 1m smooth layer, Cutting away from the eyes arranged in the side of the wall on the second floor reserved for smooth blasting around the eyes more than surface layout of th

53、e empty eyes, a small charge. Put an end to ultra-digging, digging, when partially due to artificial air pick excavation. </p><p>  Through the above effective measures, in the wall during the constru

54、ction of the second blast, right in the thick wall of 0.15m basic did not cause damage to the smooth passage of the double-arch tunnel "0" from the excavation.</p><p>  5.4 Auxiliary scissors to st

55、rengthen supporting </p><p>  By ANSYS simulation analysis, in order to ensure that small section of tunnel construction safety, the need for auxiliary support of small section tunnel reinforcement to

56、resist the impact of blasting and rock produced by the instantaneous release of excavation loads generated by bias. </p><p>  Supporting materials, using I20 steel, welded steel plate embedded in the

57、 grille on both ends, using high-strength bolt reinforcement. Support arrangement spacing of 0.6m, which are arranged on a grid for each Pin, arranged to extend the scope to a double-arch on each side of 1.2m, and the co

58、mpletion of the excavation before the big end. The height and angle of support arrangements to ensure the smooth passage of construction machinery and equipment. Through the construction of proof, supporting</p>&

59、lt;p>  5.5 Information Construction </p><p>  In order to ensure structural safety and construction safety, in the tunnel construction process to carry out real-time monitoring measurements to stud

60、y the supporting structure and the surrounding strata deformation characteristics to predict the corresponding supporting structure deformation and verify that the supporting structure is reasonable, for the information

61、technology provide the basis for the construction. Construction Monitoring and Measurement shows a small section of the tunnel ma</p><p>  6 Construction Summary </p><p>  Through this pr

62、oject example, proved that the use of separate programs to ensure that the wall construction of tunnels section of arch construction safety and structural safety, duration of more than a single type of wall construction

63、program faster 1.0 to 1.5 months. This project for similar future subway construction has achieved successful experiences and Application examples. </p><p>  By summarizing the analysis, the following

64、conclusions: </p><p>  (1) In accordance with the actual geological conditions boldly changed a single type of double-arched wall to separate the construction of walls, similar to conventional ultra-s

65、mall-distance tunnel construction, eliminating double-arch tunnel Construction of the wall must be of conventional construction method, the final lining of structural forces has little effect on the structure of water is

66、 more favorable, and shorten the construction duration. Through the construction of this project in two</p><p>  (2) The construction of the key technology is to reduce the damage and disturbance of surround

67、ing rock, as well as the protection of the tunnel structure has been forming. Therefore, in the double-arched wall at the weak control of a weak good millisecond blasting will be the focus of the success of the construct

68、ion. Smooth layer of smooth blasting using reserved achieved the desired results. If the reserved right to take a static smooth layer of rock blasting will be even better. </p><p>  (3) to strengthen the wea

69、k in the wall is also supporting the construction of this important reasons for the success. From the mechanical analysis of view, invert the junction with the side walls are most affected, ensuring adequate capacity to

70、withstand the initial load supporting; second is to strengthen the body in the clip rock column grouting reinforcement of its use of the pull bolt, strengthening bolt and grouting reinforcement, ensuring the stability of

71、 surrounding rock. Used in the cons</p><p>  (4) reasonably arrange construction sequence so that all processes in the conversion with minimal impact during the construction of each other. </p><p

72、>  References </p><p>  [1] LIU Xiao-bing. Double-arch tunnel in the form of wall-structured study [J]. Construction Technology 2004-10, 15 </p><p>  [2] Wang Junming. Weak rock sections doub

73、le-arch tunnel Construction Technology [J]. Western Exploration Engineering, 2003-06 </p><p>  [3] GB50299-1999 underground railway Engineering Construction and acceptance of norms [S]. Beijing: China Planni

74、ng Press, 1999 </p><p>  城市地下鐵道連拱隧道群施工技術(shù)研究</p><p>  摘要:利用廣州地鐵工程實例,對連拱隧道群施工工法進行探討。在廣州地鐵施工中首次提出了將連拱隧道改為單洞隧道施工技術(shù),并對單一式中墻和分離式中墻結(jié)構(gòu)的技術(shù)方案進行了比選,得出了滿足結(jié)構(gòu)安全、施工安全和經(jīng)濟效益較好的技術(shù)方案,可為今后類似工程的設(shè)計和施工提供借鑒和參考。</p>

75、;<p>  關(guān)鍵詞:連拱隧道群;單一式中隔墻;分離式中隔墻;施工技術(shù)。</p><p>  地鐵隧道由于線路設(shè)計要求,產(chǎn)生多種隧道結(jié)構(gòu)形式,其中由不等跨雙連拱和三連拱隧道組成的連拱隧道段常用于正線和渡線的連接。本文結(jié)合工程實例,根據(jù)隧道所處地質(zhì)條件、工期要求,通過比選提出了可達到快速施工和節(jié)省施工成本目的的最佳施工方案。</p><p><b>  1 工程概況&

76、lt;/b></p><p>  廣州地鐵三號線體育西路站折返線為體育西路站站后折返線,結(jié)構(gòu)形式復雜,在 DK3+016.047~+037.157段設(shè)置了不等跨雙連拱結(jié)構(gòu)、三連拱結(jié)構(gòu)等隧道群。不等跨連拱隧道開挖跨度為20.1m,開挖高度為 10.076m,跨矢比為1∶0.5,小洞襯砌后跨度為5.2m,大洞襯砌后跨度為11.4m,中墻厚度為1.6m。三連拱隧道開挖跨度為19.9m,開挖高度為7.885m,跨矢

77、比為1∶0.1。連拱隧道段的圍巖自上而下有:人工填土層、沖—洪積砂層、沖積—洪積土層、河湖相沉積土層、可塑狀殘積土、硬塑—堅硬狀殘積土、全風化巖層、強風化巖層、中風化層和微風化層。隧道通過地層巖質(zhì)較為均一,強度較高,承載能力強,穩(wěn)定性好。隧道拱頂覆蓋層厚度為15.5~18m,其中拱頂Ⅳ級圍巖層厚度為5.6~7.6m。連拱隧道段地下水埋深為2.28~4.1m,主要是第四系孔隙水和裂隙水。</p><p>  2 雙

78、連拱段施工方案比選</p><p>  由于連拱隧道段結(jié)構(gòu)比較復雜,隧道斷面變化較大,施工工序繁復,施工難度高,施工周期長,所以選擇一個好的施工方案對優(yōu)質(zhì)高效完成連拱隧道段的施工尤為重要。選擇施工方案時主要考慮以下幾個方面:(1)施工安全和結(jié)構(gòu)安全;(2)施工難度;(3)施工周期;(4)經(jīng)濟效益。本著這四條原則,經(jīng)過施工方案的研究和論證,選出下面兩個施工方案進行比較甄選。</p><p>

79、  2.1 單一式中墻施工方案</p><p>  該方案的主要施工步驟及措施如下:</p><p>  (1)從右線雙連拱小洞隧道內(nèi)向折返線側(cè)進行臨時施工通道、雙連拱和三連拱中墻施工,完成后中墻及時支撐,施工時防止偏壓。</p><p>  (2)中墻襯砌施工完成后,按照“先小后大、封閉成環(huán)”的原則,用臺階法進行右線施工,用CRD工法進行折返線大跨度隧道施工。&l

80、t;/p><p>  (3)當折返線側(cè)施工到三連拱隧道中墻后,再按照右線中墻施工方法進行三連拱和雙連拱中墻施工,這期間右線停止掘進,直到中墻施工完成。</p><p>  (4)折返線側(cè)中墻施工完成后,右線繼續(xù)往前施工。</p><p>  該工法為國內(nèi)連拱隧道常規(guī)施工工法,廣州地鐵、南京地鐵和北京地鐵中均有應(yīng)用,并能安全順利地完成隧道群的施工。但是對以往的工程實例和施

81、工技術(shù)的研究可以發(fā)現(xiàn),該方案還存在不足和缺陷。</p><p>  (1)本方案運用于本工程上,在短短的21.11m的連拱隧道內(nèi),隧道的初期支護和二次襯砌間將轉(zhuǎn)換4次, 轉(zhuǎn)換過于頻繁。</p><p>  (2)中墻和邊洞隧道襯砌涉及的防水層施工、鋼筋工程、模板工程、混凝土澆注均需多次轉(zhuǎn)換,施工周期長達2個月。</p><p>  (3)襯砌完成后,中墻防偏壓支撐和

82、材料設(shè)備的投入,導致施工成本增高,經(jīng)濟效益降低。</p><p>  2.2 分離式中墻施工方案</p><p>  該方案的主要施工步驟及措施如下:</p><p>  (1)將不等跨雙連拱隧道改為兩個單洞,變更為分離式中墻,先從右線單線隧道往前施工。</p><p>  (2)對三連拱隧道先不施作中墻襯砌,按單線工況通過。</p&g

83、t;<p>  (3)對右線的大斷面雙連拱隧道按照CRD工法側(cè)壁通過。</p><p>  (4)折返線側(cè)則按照右線相反的施工順序進行施工。</p><p>  采用本方案實際就是按照兩條單線的施工方法進行,與上一方案進行對比后,具有如下優(yōu)點:</p><p>  (1)減少施工工序,加快工序的銜接轉(zhuǎn)換。</p><p>  (

84、2)降低了施工難度,縮短了施工周期。</p><p>  (3)降低了施工成本,提高了經(jīng)濟效益。</p><p>  (4)變單一式中墻為分離式中墻,徹底地解決了連拱隧道結(jié)構(gòu)的防水上的缺陷。</p><p>  (5)三連拱隧道中洞后期施工,相當于大跨度隧道預留了核心巖體,有利于兩側(cè)雙連拱隧道施工安全。</p><p>  3 三連拱段施工方

85、案</p><p>  從右線直接進入三連拱隧道,其支護參數(shù)以原設(shè)計進行,格柵全環(huán)安設(shè),按設(shè)計全環(huán)噴射混凝土,并加強中墻拱頂處的錨桿設(shè)置(折返側(cè)同右線施工方法),在中墻施工時需要破除隧道格柵接頭處設(shè)一縱向加強梁。</p><p>  嚴格控制每循環(huán)開挖進尺,格柵間距為0.6m/榀。中墻開挖采用微差弱爆破方案(有條件盡量采用靜態(tài)爆破方案),最大限度地減少對中墻巖層和已襯砌隧道的擾動,確保施工

86、安全。中墻開挖完成后,立即進行二次襯砌。中墻施工完成后對中墻空隙進行回填,加千斤頂支護。一側(cè)施工完成后,才進行另一側(cè)中墻施工。當兩側(cè)中墻施工完成后,及時進行兩側(cè)單洞隧道的二次襯砌,然后進行三連拱隧道中間巖體的開挖和襯砌。施工中應(yīng)特別注意三連拱隧道中墻處的沉降和收斂變形,如出現(xiàn)異常現(xiàn)象,立即進行加固處理。</p><p>  4 施工時結(jié)構(gòu)受力性態(tài)分析</p><p>  將不等跨雙連拱的中

87、墻取消,改為分離式中墻,在國內(nèi)城市地下鐵道工程中尚未有類似工程設(shè)計及施工經(jīng)驗,也沒有類似隧道結(jié)構(gòu)設(shè)計,因此結(jié)構(gòu)是否安全,以及施工過程中工序轉(zhuǎn)換時施工是否安全,將是本方案研究的重點。</p><p>  應(yīng)用ANSYS有限元通用程序軟件對不等跨連拱隧道進行數(shù)值模擬計算,采用地層-結(jié)構(gòu)的模式對隧道結(jié)構(gòu)的受力和變形進行分析。所取受力范圍水平方向沿隧道橫斷面方向以洞跨的3倍為限,垂直方向上方取至地表、下方以洞跨的3倍為限

88、,單元模型采用DP地層材料的彈塑性實體,隧道襯砌采用彈性梁單元模擬,梁單元和實體單元采用藕合方程連接。通過表2中的數(shù)據(jù)分析可以看出,大隧道在施工時對小隧道的影響較大,如果對小斷面隧道采用必要的加強措施,并控制臨時支撐的縱向拆除間距,該方案是有益并可行的。</p><p>  5 施工關(guān)鍵技術(shù)及對應(yīng)措施</p><p>  連拱隧道段的施工是需要在嚴密的施工組織和強有力的技術(shù)保證措施下進行的

89、,組織好各施工步驟,準備好各種技術(shù)預防措施是施工成功的關(guān)鍵。</p><p>  5.1 對拉錨桿及加強錨桿</p><p>  取消單一式中墻后,開挖完成后中墻厚度為0.8m,對拉錨桿和加強錨桿的設(shè)置是非常必要的。對拉錨桿采用Φ22鋼筋藥卷錨桿,間距為0.6m×0.5m, 長度根據(jù)中墻的厚度變化為0.8~2.0m。加強錨桿設(shè)于中墻兩側(cè)仰拱和邊墻處,采用3.0m的Φ25中空注漿錨

90、桿,間距0.6m×0.8m。</p><p>  5.2 中墻夾巖柱體注漿加固</p><p>  中墻巖體最薄處為0.15m,經(jīng)過多次爆破開挖過程的影響,中墻周圍的圍巖松動,其承載力受影響。因此,必須分別在中墻拱頂、墻、仰拱處對松動圍巖進行注漿。預埋Φ42鋼管,漿液采取水泥-水玻璃雙液漿,參數(shù)為1∶1水泥漿和30~45Be水玻璃溶液,注漿壓力為0.2~1.0MPa。在兩次開挖中

91、中墻均進行注漿,最后開挖完成后對中墻夾層進行飽和注漿。</p><p>  5.3 微差微震爆破技術(shù)</p><p>  隧道開挖全部采用鉆爆法施工。由于地處廣州市繁華地段,地面建筑物密集,且隧道采用“0”間距開挖,爆破時必須按照預留光面層光面微震微差爆破方案進行施工,將爆破震動控制在容許范圍內(nèi)。對于連拱隧道所處地層為Ⅲ、Ⅳ級圍巖采取的爆破措施為:</p><p>

92、  (1)爆破器材采用低震速乳化炸藥。</p><p>  (2)嚴格控制每循環(huán)進尺(0.6~0.8m),周邊炮眼間距為0.4m,減少裝藥量,控制光面爆破效果。</p><p>  (3)每次爆破使用多段位雷管起爆,采用非電毫秒雷管不對稱起爆網(wǎng)路微震動技術(shù)。</p><p>  (4)中墻處采取二次開挖施工,先預留1m光面層,掏槽眼布置在遠離中墻的一側(cè),對預留的光面

93、層二次爆破時周邊眼光面層多布置空眼、少裝藥。杜絕超挖,局部欠挖時采用人工風鎬開挖。</p><p>  通過以上有效措施,在中墻二次爆破施工時,對0.15m厚的中墻基本未造成破壞,順利通過了連拱隧道的“0”距離開挖。</p><p>  5.4 輔助剪刀撐加強支護</p><p>  通過ANSYS模擬分析,為確保小斷面隧道施工安全,必須對小斷面隧道進行輔助支撐加固

94、,抵御爆破產(chǎn)生的瞬時沖擊和巖層開挖時荷載釋放產(chǎn)生的偏壓。</p><p>  支撐材料采用I20型鋼,焊接于兩端格柵預埋鋼板上,并采用高強螺栓加固。支撐布置間距為0.6m,即每一榀格柵上均布置,布置范圍延長至雙連拱兩邊各 1.2m,并在開挖大端面前完成。支撐布置的高度和角度要確保施工機械設(shè)備能順利通行。通過施工證明,支撐的設(shè)置是必要和有效的,小斷面隧道在加設(shè)輔助剪刀撐后收斂僅為5mm。</p>&l

95、t;p><b>  5.5 信息化施工</b></p><p>  為確保結(jié)構(gòu)安全和施工安全,在隧道施工過程中開展實時監(jiān)控量測,研究支護結(jié)構(gòu)和周邊地層的變形特征,預測相應(yīng)的支護結(jié)構(gòu)變位并驗證支護結(jié)構(gòu)的合理性,為信息化施工提供依據(jù)。施工中監(jiān)控量測顯示,小斷面隧道最大沉降為14.6mm,大斷面隧道最大沉降為17.2mm,結(jié)構(gòu)收斂最大值為7.6mm,地面最大沉降為10mm,三連拱中洞開挖拱頂

96、最大沉降為22.8mm。</p><p><b>  6 施工總結(jié)</b></p><p>  通過本工程實例,證明了采用分離式中墻施工方案能夠保證連拱隧道群段的施工安全和結(jié)構(gòu)安全,工期比采用單一式中墻施工方案快1.0~1.5個月。本工程為今后類似的地下鐵道建設(shè)取得了成功的經(jīng)驗和應(yīng)用實例。</p><p>  通過總結(jié)分析,得出以下結(jié)論:<

97、;/p><p>  (1)根據(jù)實際地質(zhì)情況大膽地改雙連拱單一式中墻為分離式中墻進行施工,類似于常規(guī)的超小凈距隧道施工,摒棄雙連拱隧道必須先施工中墻的常規(guī)工法,對最終襯砌結(jié)構(gòu)受力影響較小,對結(jié)構(gòu)防水更有利,并且縮短了施工工期。通過本工程的兩次施工,實現(xiàn)了超小間距隧道“0”間距開挖施工技術(shù)的重大突破。</p><p>  (2)施工中的關(guān)鍵技術(shù)是減少圍巖的破壞及擾動,以及對已經(jīng)成型隧道結(jié)構(gòu)的保護。

98、因此在雙連拱薄弱的中墻處控制好微差弱爆破將是施工取得成功的重點。采用預留光面層光面爆破取得了理想的效果。如果對預留的光面層巖體采取靜態(tài)爆破將更加理想。</p><p>  (3)對薄弱中墻的加強支護也是本次施工取得成功的重要原因。從受力分析看,仰拱與側(cè)墻連接處受影響最大,確保了初期支護承受足量荷載;其次是加強對中夾巖柱體的注漿加固,對其采用對拉錨桿、加強錨桿和注漿加固,確保了圍巖的穩(wěn)定。施工采用的對拉錨桿如果充分

99、運用預應(yīng)力加固,效果可能會更好。</p><p>  (4)合理安排好施工先后順序,使各工序在轉(zhuǎn)換施工時相互影響最小。</p><p>  參考文獻[1]劉小兵.雙跨連拱隧道中墻結(jié)構(gòu)合理形式研究[J].施工技術(shù),2004-10,15[2]汪俊明.軟弱圍巖地段雙連拱隧道施工技術(shù)[J].西部探礦工程,2003-06[3]GB50299-1999 地下鐵道工程施工及驗收規(guī)范[S].北京:中

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論