版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、 Hydraulic excavator shovel device simulation designAbstract: In recent years, as steel, coal industry and quarrying continued rapiddevelopment, excavators engineering machinery requirement increasingly, and iswi
2、dely used in housing construction, road engineering, water conservancy construction, forestry development, port construction, national defense constructionand conditions of fortifications mining extraction indust
3、ryDue to the complex and changeable, mining operation condition is often with operator way according to the actual working experience, decision, in order to reduce homework to excavate themining experience operator, the
4、effects will is in urgent need to build up the bucket with various hydraulic cylinder dig trajectory direct corresponding relation, realize theautomation. Excavator operationAt the same time because of the complexity of
5、 an excavator working environment and conditions, requires the fluidity of hydraulic excavator itself according to the different structural environment makes thecorresponding adjustment, this determines the ex
6、cavator design of ordinary sex, repeatability. However hydraulic excavator working device is a much more freedom,the hinge point bar system to determine the very complex, these factors will cause thehydraulic excavator b
7、ig investment, design cycle is long, the serious influence on theeconomic benefits of the manufacturers and national economic development. This paper mainly design work mainly in the following aspects: in the field surve
8、ying and mapping and reference on the basis of relevant information about the hydraulic excavator way of working and working environment Determine the hydraulic excavator, each working device search relevant material and
9、 structure of practical experience formula of the overall work device for excavators designed, use proportion method and experience calculation work device each part of basic size and carries on the stress analysis, and
10、 then plot its two-dimensional CAD drawings, and then painted with PRO/E 3d model of each device. After each device assembly of its motion simulationKeywords: Hydraulic Excavator; Working device; Boom;Stick;Face-shovelS
11、ignature of supervisor:Hydraulic excavator shovel device simulation designAbstract: In recent years, as steel, coal industry and quarrying continued rapiddevelopment, excavators engineering machinery requirement incr
12、easingly, and iswidely used in housing construction, road engineering, water conservancy construction, forestry development, port construction, national defense constructionand conditions of fortifications mini
13、ng extraction industryDue to the complex and changeable, mining operation condition is often with operator way according to the actual working experience, decision, in order to reduce homework to excavate themining exper
14、ience operator, the effects will is in urgent need to build up the bucket with various hydraulic cylinder dig trajectory direct corresponding relation, realize theautomation. Excavator operationAt the same time because o
15、f the complexity of an excavator working environment and conditions, requires the fluidity of hydraulic excavator itself according to the different structural environment makes thecorresponding adjustment, this
16、 determines the excavator design of ordinary sex, repeatability. However hydraulic excavator working device is a much more freedom,the hinge point bar system to determine the very complex, these factors will cause theh
17、ydraulic excavator big investment, design cycle is long, the serious influence on theeconomic benefits of the manufacturers and national economic development. This paper mainly design work mainly in the following aspects
18、: in the field surveying and mapping and reference on the basis of relevant information about the hydraulic excavator way of working and working environment Determine the hydraulic excavator, each working device search r
19、elevant material and structure of practical experience formula of the overall work device for excavators designed, use proportion method and experience calculation work device each part of basic size and carries on the
20、stress analysis, and then plot its two-dimensional CAD drawings, and then painted with PRO/E 3d model of each device. After each device assembly of its motion simulationKeywords: Hydraulic Excavator; Working device; Boo
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 眾賞文庫僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
評論
0/150
提交評論