某隧道工作井深基坑施工變形特性研究.pdf_第1頁
已閱讀1頁,還剩71頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、江蘇科技大學(xué)碩士學(xué)位論文某隧道工作井深基坑施工變形特性研究姓名:許為強(qiáng)申請(qǐng)學(xué)位級(jí)別:碩士專業(yè):結(jié)構(gòu)工程指導(dǎo)教師:姜朋明;尹蓉蓉2011-03-12Abstract III Abstract With the rapid development of modern urban construction, and further development and utilization of underground space, the de

2、ep foundation construction on the surrounding environment influence has been highly valued. How to control the retaining structure deformation and soil displacement around deep foundation, protect the surrounding buildin

3、gs and public facilities is the question which must be considered in excavation process. Background in Pudong working well of Shanghai West Changjiang Road Tunnel, a series of studies for deformation law and control meas

4、ures of retaining structure and soil in the whole process of excavation and supporting construction of deep foundation in soft soil area is carried out, the main contents are as follows: 1.At the excavation process of f

5、oundation with depth of 28m of Pudong working well of Shanghai West Changjiang Road Tunnel, retaining structure deformation and surrounding displacement of soil are actually measured and researched, and the appropriate m

6、onitoring scheme is formulated according to the design and construction project of supporting structure of this foundation. In different conditions, the lateral displacement and the vertical displacement of diaphragm wal

7、l, the settlement of lattice column and soil behind the wall, the axial force of struts, and the settlement of existing buildings are made on monitoring in the whole process. A profoundly analysis is made to monitoring r

8、esults, then obtained the laws of the displacement of diaphragm wall varied with depth, the settlement of lattice column and the vertical displacement of diaphragm wall varied with time, the axial force of struts varied

9、with time, and the settlement of soil behind the wall varied with horizontal distance, can provide a reference to design of same foundation. 2.The full construction process of the retaining scheme in this project was si

10、mulated by three-dimensional finite element software-ADINA according to the actual construction conditions, the nonlinear of soil and interaction between soil and structure are considered in simulation process. The displ

11、acement of diaphragm wall, soil resilience, the axial force of struts, the displacement of soil behind the wall, and so on are obtained in different conditions. 3.The actual measurement data and numerical simulation resu

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 眾賞文庫僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論